Laserfiche WebLink
physical dimensions layouts. <br />• New single line drawing of all power distribution. <br />• Revised power wiring and field instrumentation changes including conduit and wire. <br />3. Write specification including: <br />• Switchgear, Motor Control Center, Power Distribution <br />• Variable Frequency Drives / Solid State Starters <br />• Programmable Logic Controllers / Control Panel / Field Instrumentation <br />• Pump Station — Sequence of Operation <br />4. Prepare design, drawing and specification review limitations with City of Santa Ana: <br />• Initial Study design meetings with the City of Santa Ana .....................limit of (3) meetings <br />• Drawing and specification review meetings with the City of Santa Ana.....limit of (3) meetings <br />5. Insurance coverage to include: <br />• Professional liability "errors and omissions" liability - $1,000,000 <br />NOT INCLUDED: <br />1. Submittal drawing review process of successful bidder. <br />2. Civil Engineering structural changes (by others). <br />3. Any planning for demolition or removal of asbestos or equipment containing or using asbestos. <br />ALL FOR THE NET SUM OF: $10.000.00 <br />TEN THOUSAND DOLLARS & NO CENTS <br />Payment terms: Net 30 -days. <br />Regards, <br />.i <br />/L <br />Craig Lamascus, P.E. <br />Harold Wells Associates <br />Santa Ana Proposal _Garthe _ luly_2005.doc 2 of 2 <br />os/09/05 <br />