My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HAROLD WELLS ASSOCIATES 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
G-H (INACTIVE)
>
HAROLD WELLS ASSOCIATES 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2015 9:39:51 AM
Creation date
9/23/2005 2:01:38 PM
Metadata
Fields
Template:
Contracts
Company Name
Harold Wells Associates
Contract #
N-2005-109
Agency
Public Works
Expiration Date
6/30/2006
Insurance Exp Date
5/15/2007
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAROLD WELLS ASSOCIATES <br />July 28, 2005 <br />City of Santa Ana <br />Public Works Maint., M -8 <br />Corp. Yard/ Bldg. A <br />220 S. Daisy St. <br />Santa Ana, CA 92703 <br />ATTENTION: NABIL SABA <br />REFRENCE: PROPOSAL FOR ENGINEERING / CONSULTING SERVICES <br />GARTHE PUMPING STATION <br />Dear Mr. Saba: <br />As requested, this proposal is for engineering services to prepare shop drawings and specifications to <br />upgrade the GARTHE PUMPING STATION as part of a prepared bid package by the City of Santa <br />Ana for solicitation of bids from various selected prime contractors. <br />Site Description: ❑ Proposed Construction ® Existing Installation <br />The facility is located at 2401 S. Bristol St. in Santa Ana, CA. The facility has an existing power <br />distribution transformer, which is owned by Southern California Edison. The rated current and available <br />fault current fall within the capabilities of the Power Distribution equipment, as displayed on the <br />nameplate of the equipment, presently installed at the site. This facility has a small amount of single - <br />phase loads installed. The three -phase loads are primarily pumping related. <br />Scope of Work: ® Design Study ❑ Troubleshooting /Analysis <br />The scope of work for this project included in this proposal is as follows: . <br />1. Conduct principle of operation study of the existing pump station and make recommendations for <br />changes. The study will describe how the modified pump station will be operated to cover the entire <br />range of pumping operations. A California Registered Engineer will complete this study. <br />2. Prepare bid drawings: <br />• Existing layout of pumps, motors, electrical control room and power distribution. <br />• Existing single line for the power distribution including utility transformer. <br />• Demolition plan of all equipment to removed or relocated. Note this demolition plan <br />specifically excludes any planning or engineering related to the demolition or removal or <br />any equipment containing asbestos. <br />• Revised layout showing relocation of reused equipment and new equipment added including <br />741 EAST BALL ROAD • ANAHEIM, CA • 92805 <br />PHONE (714) 490 -0770 • FAX: (714) 490 0772 <br />Santa Ana Pcoposal_Garthejuly_2005 doc 1 of 2 08/09/05 <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.