Laserfiche WebLink
<br />EXHIBIT B-1 <br /> <br />SANTA ANA CIVIC CENTER PARKING STRUCTURE <br />BUDGET <br /> <br />DESCRIPTION <br />SITE ALLOWANCE <br />DEMOLITION, SHORING, EARTHWORK & GRADING <br />SITE UTILITIES <br />ASPHALT PAVING <br />LANDSCAPE, IRRIGATION <br />SITE CONCRETE <br />SITE ELECTRICAL <br />TOTAL SITE ALLOWANCE <br />PARKING STRUCTURE <br />CRACK CONTROL ALLOWANCE <br />ENGINEERING FIELD <br />SECURITY FENCING OUTSIDE GARAGE FOOTPRINT <br />EXCAVATION & BACKFILL <br />PILES-DRIVEN/POURED <br />SITE CONCRETE / STAIRS <br />PARKING LOT STRIPING / BUMPERS <br />REINFORCING STEEL & P T <br />BARRIER CABLE <br />CONCRETE FORM <br />MASONRY <br />STEEL MISCELLANEOUS <br />SHEET METAL <br />CAULKING & BGWP <br />METAL DOORS/FRAMES/HARDWARE <br />OVERHEAD DOORS <br />GLASS & GLAZING <br />LATH & PLASTER <br />CERAMIC TILE <br />PAINTING <br />SIGNS & GRAPHICS <br />TOILET PARTITIONS / ACCESSORIES <br />SPECIALTIES & EQUIPMENT <br />PARKING CONTROLS (ALLOWANCE) <br />ELEVATORS <br />FIRE SPRINKLER SYSTEM / EXTINGUISHERS <br />PLUMBING <br />HVAC <br />ELECTRICAL <br />FINAL CLEAN-UP <br />TEMP. POWER <br />CONTINGENCY <br />SUBCONTRACTORS FEE & GENERAL CONDITIONS <br /> <br />300 CARS <br /> <br />$648,490 <br />$221,750 <br />$108,378 <br />$92,900 <br />$59,720 <br />$160,750 <br />$1 ,291.988 <br /> <br />$2,500 <br />$6,000 <br />EXCLUDED <br />$58,233 <br />EXCLUDED <br />$33,000 <br />$7,500 <br />$500,614 <br />$25,475 <br />$1,440,708 <br />$72,908 <br />$274,337 <br />$3,784 <br />$7,642 <br />$3,100 <br />$10,000 <br />$7,200 <br />$39,278 <br />$4,200 <br />$17,840 <br />$3,200 <br />N/A <br />N/A <br />$30,000 <br />$58,539 <br />$38,300 <br />$86,170 <br />$5,135 <br />$164,478 <br />$4,923 <br />$10,000 <br />$200,000 <br />$356,089 <br />