Laserfiche WebLink
<br />SUBTOTAL PARKING STRUCTURE <br />SUBTOTAL PARKING STRUCTURE & SITEWORK <br />GENERAL LIABILITY INSURANCE <br />PERMIT FEES <br />STAFFING & SITE EXPENSES <br /> <br />$3.471.153 <br />$4.763.141 <br />$47,631 <br />BY OWNER <br />$329,659 <br /> <br />PRE-CON PHASE <br />PARKING CONSULTING <br />ARCHITECTURAL DESIGN <br />STRUCTURAL DESIGN <br />MECHANICAL, PLUMBING, AND ELECTRICAL <br />LANDSCAPE DESIGN <br />CIVIL ENGINEERING DESIGN <br />GEOTECHNICAL INVESTIGATION (SOIL REPORT) <br />ARCHITECTURAL RENDERINGS <br />PRINTING & EXPENSES <br />DEMOLITION OF JUVENILE HALL. ALLOWANCE <br /> <br />$30,000 <br />$135,800 <br />$67,900 <br />$29,050 <br />$18,850 <br />$34,829 <br />$8,200 <br />$14,000 <br />$13,000 <br />$125,000 <br /> <br />CONSTRUCTION PHASE <br />CONSTRUCTION ADMINISTRATION ( DESIGNER) <br />CONSTRUCTION MANAGEMENT FEE <br />TESTING & INSPECTION, ALLOWANCE <br /> <br />GRAND TOTAL <br /> <br />INCLUDED <br />$125,000 <br />$50,000 <br /> <br />$5.792.060 <br /> <br />THIS BUDGET IS PREPARED WITH THE UNDERSTANDING THAT THE QUALIFICATIONS <br />ATTACHED AS ATTACHMENT I HERETO, ARE PART OF THE BUDGET FOR THE PROJECT. <br />