Laserfiche WebLink
Page 5 of 24 <br />C. ROUTINE MAINTENANCE <br />Routine maintenance shall be performed at the work sites listed in Attachment A and include but not <br />be limited to the following services: <br />Turf Care <br />a) Mowing <br />(1) All casual turf (non-sport/priority turf) shall be mowed: 1) weekly April 1st through <br />October 31st; and, 2) every other week November 1st through March 31st. <br />(2) All sport/priority turf as described in Attachment 6 shall be mowed once a week. <br />The Director may require Contractor to mow the sport/priority turf areas lower than <br />casual turf areas to improve aesthetics and/or the playability of the field. <br />(3) The Contractor shall maintain mowers so that they to provide a smooth even cut <br />without the ridges or depressions and without tearing of the leaf blades (caused by <br />unsharpened mower blades). <br />(4) All turf shall be cut to a height as determined by the Director. <br />(5) The Contractor shall mow grasses and broadleaf plants once per month in the <br />Santiago Park Day Camp (Nature Reserve) meadow area. <br />b) Edging and Detailing <br />All edging shall be performed with the use of a McClain's edger or approved substitute. <br />Contractor shall edge all turf adjacent to all improved hard surfaces and, where no <br />improved surface exists, turf edges shall be maintained with string trimmers. <br />Edging/detailing shall be performed at the same time mowing occurs. Chemical detailing <br />of turf may occur with the Director's approval. If chemical detailing is performed, the <br />Contractor shall use the string trimmer to remove the treated turf within one (1) week <br />after symptoms of phytotoxicity become recognizable. <br />All clippings generated shall be removed directly and disposed of pursuant to this agreement. <br />c) Fertilization/Soil Amending <br />Contractor's, shall employ a soil -testing laboratory to test sport and priority fields' soil <br />once a year in January at Contractor's sole expense. One soil sample shall be taken at <br />each ball diamond and soccer/football field. The test will be comprehensive and the lab <br />shall provide a written report on the condition of the soil as well as recommendations of <br />how to improve the soil, soil fertility, and overall health of the turf. <br />d) Irrigation <br />(1) Turf areas shall be watered as weather conditions permit to provide adequate <br />moisture for optimum growth and color. If Contractor estimates additional water <br />above and beyond the monthly Estimated Applied Water (EAW) may be needed, <br />he/she shall request approval from the Park Services Utility Coordinator prior to <br />