My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-099 - Overriding Considerations for the Alton Avenue Overcrossing at the SR-55 Freeway Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2005
>
2005-099 - Overriding Considerations for the Alton Avenue Overcrossing at the SR-55 Freeway Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2015 12:08:46 PM
Creation date
10/26/2005 11:52:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2005-099
Date
10/17/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mitigation Monitoring and Reporting Program <br /> <br />1.0 INTRODUCTION <br /> <br />Assembly Bill (AB) 3180 [California Public Resources Code (pRe), Section 2108\.6] became law in <br />California on January I, 1989. This bill requires all public agencies to adopt mitigation or reporting plans <br />when they approve projects with Mitigated Negative Declarations or Environmental Impact Reports <br />which identify significant environmental impacts. The Mitigation Monitoring and Reporting Program <br />(MMRP) must be adopted when a public agency makes its findings pursuant to the California <br />Environmental Quality Act (CEQA) so that the program can be made a condition of project approval. <br />The program must be designed to ensure project compliance with mitigation measures during project <br />implementation. If certain project impacts extend beyond the project implementation phase, long-term <br />mitigation monitoring must be provided in the monitoring plan. <br /> <br />The National Environmental Policy Act (NEP A) does not specifically require substantive mitigation for <br />project impacts; direct, indirect, or cumulative [Robertson v. Methow Valley Citizens Council, 490 U.S. <br />332, 350 (1989)]. However, the CEQ regulations require that the Environmental Assessment include <br />consideration and discussion of possible mitigation for project impacts (40 CFR ~~ 1502.14((1), <br />1502.16(e-h), 1505.2(c), 1508.25(b)(3)). 40 CFR Section 1502.14(1) requires that agencies shall include <br />appropriate mitigation measures not already included in the proposed action or alternatives. <br /> <br />1.1 PURPOSE <br /> <br />This Mitigation Monitoring and Reporting Program (MMRP) has been developed to track compliance <br />with mitigation measures and conditions of approval outlined in the Final Environmental Impact <br />ReportJEnvironmental Assessment (FEIR/EA) prepared for the Alton Avenue Overcrossing at State <br />Route 55 (SR-55) Project. This MMRP has been prepared in conformance with PRC, Section 2108\.6 <br />and CEQA Guidelines Section 15097. <br /> <br />1.2 MITIGATION MATRIX <br /> <br />In order to effectively track and document the status of each mitigation measure, a MMRP matrix (Table <br />I) has been prepared and includes the following components: <br /> <br />o FEIRIEA Section, Page Number <br />o Description of Potential Environmental Impact <br />o Mitigation Measure <br />o Timing Implementation <br />o Performance Objective <br />o PersonIParty Responsible (usually Resident Engineer or City representative) <br />o Compliance Verification (signature and date) <br />. Comments <br /> <br />The timing fOT implementing each mitigation measure has been apportioned into several specific timing <br />increments; <br /> <br />Alton Avenue OlIercrossing at SR-55 <br />Mitigation Monitoring Plan. <br /> <br />L-I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.