Laserfiche WebLink
<br />shall submit and have approved <br />a surface drainage/utility plan <br />that depicts all applicable <br />Site Design structural Source <br />Control and Treatment Control <br />Best Management Practices in <br />accordance with the Orange <br />County Drainage Area Management <br />Plan and the City of Santa Ana <br />Local Implementation Plan. <br /> <br />Prior to the issuance of a Public Works <br />grading permit the applicant <br />shall provide two copies of the <br />Water Quality Management Plan <br />that include the following: <br /> <br />a. Site Assessment <br />b. Site Design BMP's <br />c. Applicable Routine <br />Source Control BMP's <br />d. Mechanisms by which <br />funding for long-term <br />operation and <br />maintenance of all <br />structural BMP's shall <br />be provided. <br />e. Selecting and <br />the Treatment <br />BMP's <br />f. Operation <br />Maintenance <br />describe the <br />operation <br />maintenance <br />requirements of all <br />applicable structural <br />BMP's and to identify <br />the entity in charge of <br />implementation. <br /> <br />sizing <br />Control <br /> <br />and <br />Plan to <br />long-term <br />and <br /> <br />Prior to issuance of grading <br />permits the project applicant <br />shall submit a final run-off <br />evaluation for review and <br />approval showing the existing <br />and proposed facilities and <br /> <br />Public Works <br /> <br />758-51 <br />