My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 2701 N GRAND AVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
11/07/2005
>
75B - 2701 N GRAND AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:50:36 PM
Creation date
11/2/2005 10:26:21 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
11/7/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />methods of draining the site <br />without exceeding the capacity <br />of any street or adjacent storm <br />drain facility. <br />Grading Plans and Building Planning/Building <br />Plans for the proposed project <br />shall note that construction <br />activities on the project site <br />shall take place between the <br />hours of 7:00 a.m. and 8:00 <br />p.m. Monday through Saturday <br />and no construction activity on <br />Sundays or federal holidays. <br />Grading Plans and Building Planning/Building <br />Plans shall note "No <br />construction equipment on the <br />project site shall operate <br />including warming up until <br />after 7:00 a.m. " <br /> Prior to Buildine Permits <br />Prior to issuance of building Public Works <br />permits, the applicant shall <br />provide payment of the Federal <br />Clean Water Protection <br />Enterprise Fee. <br />Building plans shall reflect Planning/Building <br />that the kitchen for the <br />proposed project shall be <br />fitted with a grease <br />interceptor to the size and <br />capacity as designated by the <br />City of Santa Ana Building <br />Division. <br />Grading Plans and Building Planning/Building <br />Plans for the proposed project <br />shall note that construction <br />activities on the project site <br />shall take place between the <br />hours of 7:00 a.m. and 8:00 <br />p.m. Monday through Saturday <br />and no construction activity on <br />Sundays or federal holidays. <br /> <br />758-52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.