Laserfiche WebLink
<br />EIR No. 2005-01, AA No. 2005-02, <br />VTTM No. 2005-05 and SPR No. 2005-04 <br />November 7, 2005 <br />Page 2 <br /> <br />one condition to require architectural consistency on the proposed <br />balustrades and windows on the side and rear elevations. Finally, the <br />Commission requested staff to study additional street names for their <br />consideration at their next scheduled meeting. Therefore, Street Name <br />No. 2005-01 is not a part of this action (Exhibit A) . <br /> <br />The Draft Environmental Impact Report (DEIR) is also included for your <br />review (Exhibit B). In accordance to the California Environmental <br />Quality Act, the Response to Comments document and the Mitigation <br />Monitoring Program, included on Exhibit A, and the DEIR constitute the <br />final EIR. <br /> <br />FISCAL IMPACT <br /> <br />There is no fiscal impact associated with this action. <br /> <br /> <br />. Trevino <br />e tive Director <br />Planning & Building Agency <br /> <br />LL:rb <br />11\reports\vttmOS-5 aaOS-2 snOS-l eir05-1 sprOS-4.cc <br /> <br />75C-2 <br />