Laserfiche WebLink
<br />09/22/2005 15:23 <br /> <br />714-557-8344 <br /> <br />COMM. & ADU. PLNG. <br /> <br />PAGE 03/04 <br /> <br />, <br /> <br />i) If a proposed project has the potential to create a major new stormwater <br />discharge' 10 a water body with an establlshod TMDL, the EIR should consider .p .1-:r. <br />quantitative analysis of the anticipated pollutant loads in the stonnwater <br />discharges to the mooiving waters. <br /> <br />j~ A reasonable analysis of the O.Imulalive impacts of the proposed project togethel:;-.. <br />with past, present and reasonably anticipated future projects (related projects) I) 1:- ~ <br />that could produce cumulative impacts with the proposed project <br /> <br />2) ~mplemantabon of pOSI-construcbo~'ttanagemant Practices (BMPs) cons~t <br />with the Water Quality Management Plan (WQMP) program in Section 7 and Exhibit <br />7-11 of the 2003 Countywide DAMP. This includes desaibing commilmerrts to <br /> <br />~~~~a:;s~n~~~te~:n~~;~~~I::~c;~~~::n~~;~ D z.. <br /> <br />Program. Under the new Municipal Stormwater NPDES permit and the rom tiA~P, <br />this project will be COIlSidered a priority project and wHI require appropriately sized <br />lrBatment ronlrol BMPs to be included in the WQMP. <br />- <br />3) Mitigation for the construction phase of the project should Include compRance with <br />the Stale General ConsIructlon Permit and the Inclusion of the following as general <br />or specific notBs on project plan sheets: <br /> <br />D3 <br /> <br />" <br /> <br />. <I) Sediment from areas disturbed by conslruclion shaD be.retaill8d'OIl.site using <br />. sirud1.iral controls to the maximum exlent pr.ICtiqI~(e. . .: .' . <br /> <br />" b)': S~;Ies'of sail shall be properly contained fb eIiInlRate nMeduafsedll)19Ot <br />lrtillspClI't'from the site to the struets, drainage of hlcl!illes,or'Sdjacentpropertles <br />via runoff, vehicle'lracJdng, or wind. '. <br /> <br />c) Appropriate BMPs for cons1ruction--related matertals, wastes, spills or residues <br />shall be implelTl9nted to mlnlmlze transport from the site 10 sImets, drainage <br />facilities. or adjoining properties by wind or runoff. <br /> <br />, d) Ruoofl from equipment and vehtde _hlll!:l shall be contained at oons1rudlon <br />sites unless treated to reduce or remove sediment and other pollutants. <br /> <br />e) All construction coolraclDr and subcontractor personnel are to:be made aware of <br />the required best management practices and good housekeeping measures for <br />the project site and any associaled construction staging areas. <br /> <br />t) At the end of each day of coostruction activity all construction debris and waste <br />materials shall be collected and property disposed In trash or recyde bins. <br /> <br />g) Consll1.lction sites shall be maintained In such a condition that a stonn does not <br /><:any wastes or pollutants off the site. Dischargers other than stonnwater (non- <br />slormwater discharges) are authorized under California's General Pennit for <br /> <br />75Cr43 <br />