Laserfiche WebLink
<br />Shea Homes Residential Project <br />Environmental Impact Report <br /> <br />Findings and Facts in Support of Findings <br /> <br />The City finds that the impacts of the project have been mitigated to the extent feasible by the <br />mitigation measures identified in the Final EIR and the MMP. The City adopts the MMP for the <br />Shea Homes Residential Project. The MMP designates responsibility and the anticipated timing <br />for the implementation of mitigation measures and conditions within the jurisdiction of the City <br />of Santa Ana. That MMP is hereby adopted and its implementation is made a condition of <br />approval of the Shea Homes Residential Project. The City approves and will implement all the <br />mitigation measures in the Final EIR. <br /> <br />6.0 ALTERNATIVES <br /> <br />An EIR prepared pursuant to CEQA and the CEQA Guidelines must describe and comparatively <br />evaluate a range of alternatives to the proposed project (Section 15126.6 of the CEQA <br />Guidelines). Analysis of every possible alternative or options or combination of options would <br />overburden the EIR with an urmecessary amount of detail that would be redundant and complex <br />and would, as a result, fail to provide meaningful information for the City to consider in its <br />review of the project. To develop alternatives that are analyzed in the EIR, a list of potential <br />alternatives was prepared. For this analysis, the project alternatives were evaluated to determine <br />the extent to which they meet the basic project objectives, while avoiding or substantially <br />lessening any significant adverse impacts of the proposed project. Those alternatives, which met <br />the basic objectives and avoided or lessened adverse project impacts, were advanced for further <br />evaluation in the EIR. Those alternatives, which did not meet the basic objectives or which did <br />not lessen adverse project impacts, were not advanced in the EIR for further evaluation. <br /> <br />6.1 ALTERNATIVES CONSIDERED BUT NOT ADVANCED IN EIR FOR FURTHER <br />EVALUATION <br /> <br />Potential alternatives to the Shea Homes Residential Proj ect were considered by the City but were <br />not advanced for further evaluation in the EIR. The alternatives failed to carry out the goals and <br />objectives of the proposed project. The reasons the alternatives were not advanced are described in <br />the following Sections. <br /> <br />6.1.1 Alternative Location <br /> <br />Because the City of Santa Ana is nearly built out, very little opportunity exists for an alternative site <br />to be developed that meets the same or similar objectives of the project and which is designated for <br />single family residential uses by the City's General Plan and Zoning Ordinance. Because of the <br />limited availability of land in the City, the Alternative Location Alternative was not advanced for <br />further review in the EIR. <br /> <br />6.1.2 Commercial Office Development <br /> <br />Previously, located on the proj ect site was a commercial office use. The Commercial Office <br />Development Alternative would not be consistent with the General Plan and would not meet the <br />objectives of the project to provide residential uses on the project site. Therefore, the Commercial <br />Office development Alternative was not advanced for further review in the EIR. <br /> <br />Page 21 <br /> <br />75C,rB8 <br />