Laserfiche WebLink
EXHIBIT A-1 <br />SCOPE OF SERVICES <br />INSTALLATION OF SECOND STREET FOUNTAIN <br />Program Manager will provide program and construction management services to <br />deliver the fountain per City approved plans entitled "Second Street Fountain Installation <br />Between Broadway and Sycamore" on file with the Santa Ana Public Works Agency. <br />Said services include development of a project budget, and scheduling required to <br />accomplish the completion of said Project 1, within the Budget set forth in Exhibit B-1. <br />INSTALLATION OF BOLLARDS AT SANTA ANA DEPOT <br />Program Manager will provide program and construction management services to <br />install vehicle barrier bollards at the perimeter of the Santa Ana Depot. Said services <br />include development of a project budget, and scheduling required to accomplish the <br />completion of said Project 2, within the budget set forth in Exhibit B-2. <br />SANTA ANA EMERGENCY OPERATIONS CENTER <br />PHASE 1 --DESIGN DEVELOPMENT <br />PROJECT 3 <br />The scope of services under this Article shall be the development of a preliminary design, <br />project budget, and scheduling required to accomplish the preparation and submission of <br />the Program Manager's Design Development Proposal and Project Budget for the <br />Emergency Operations Center (Project 3). Design services shall include the architectural <br />and electrical design. <br />1.2 The Program Manager shall be responsible to the City for acts and omissions of <br />the Contractor or other subconsultants performing any portion of the Program Manager's <br />obligations under this Agreement. <br />1.3 Nothing contained in this Article shall create a contractual relationship between <br />the City and any person or entity other than the Program Manager. <br />1.4 The Program Manager shall visit the site, become familiar with the local <br />conditions, and correlate observable conditions with the requirements of the City's <br />program and schedule. <br />