My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMMUNICATIONS SUPPORT5
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
C (INACTIVE)
>
COMMUNICATIONS SUPPORT5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 4:24:41 PM
Creation date
12/22/2005 3:04:14 PM
Metadata
Fields
Template:
Contracts
Company Name
Communications Support Group
Contract #
A-2005-263
Agency
Parks, Recreation, & Community Services
Council Approval Date
11/7/2005
Expiration Date
10/31/2006
Insurance Exp Date
4/2/2007
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />PROOF OF PERFORMANCE TESTING <br />I. Perform a series of television signal level measurements to ascertain franchise <br />compliance. All testing shall be coordinated and supervised by Consultant. <br />A. Test shall be performed at the tap location under the existing conditions. <br />B. No accommodations shall be made to allow the City to correct problems found <br />prior to testing. <br />C. Prior to the commencement of testing, obtain the necessary calibration certificate <br />For all frequency/voltage sensitive equipment which will be used in the field <br />testing from the Grantee. <br />D. A 100' calibrated RG -59 jumper shall be used to connect the output of a <br />Subscriber tap to the input of the measuring equipment. <br />II. An abbreviated proof of performance check shall be completed for each of the six (6) <br />Construction phases. A minimum of five (5) different locations per construction <br />phase for the subscriber cable, and a total of five (5) random locations location for <br />each of the four (4) legs of the Instititutional Network (I -NET) shall be selected and <br />tested for compliance as set forth in the following sections. <br />A. The following test shall be performed at the headend prior to field testing and then <br />at all subscriber network testpoints. <br />Vistigal carrier levels <br />Aural carrier levels <br />Vistiga/Aural difference (calculated) <br />Sweep Peak -to -Valley <br />Carrier -to -Noise <br />Low frequency distortions ("Hum") <br />Composite Triple Beat <br />TASO rating of picture distortions on all channels <br />B. The following tests shall be performed at the headend and at the field test <br />Locations on the Institutional Network: <br />Vistigal carrier levels <br />Aural carrier levels <br />Vistigal/Aural difference (calculated) <br />Sweep Peak -to -Valley <br />Carrier -to -Noise <br />Low frequency distortions ("Hum") <br />TASO rating of picture distortions on all channels <br />(C <br />
The URL can be used to link to this page
Your browser does not support the video tag.