My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'-' <br /> <br /> a. <br />\..r b. <br /> c. <br /> d. <br /> <br />Exhibit A: Statement of Work <br /> <br />used in conjunction with the Project Schedule. The purpose of the log is to identify outstanding <br />issues, provide continual status updates on specific tasks and to identify responsibilities of the <br />parties. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when the Project Kickoff Session has been held with Positron <br />representatives in attendance, an action item log has been developed by both Positron and Santa Ana, <br />and a schedule has been prepared and all subtasks have been completed in their entirety. <br /> <br />Task I-A: <br /> <br />Finalize Hardware Requirements and Conduct Site Survey/Preparation <br /> <br />Objective: <br /> <br />Validate and finalize Santa Ana's hardware and third-party software requirements. <br /> <br />Task Description: <br /> <br />Posnron will reevaluate the proposed hardware configuration for accuracy and completeness. This <br />validation step will also include verification of hardware, operating system software, and third-party <br />software warranty periods and future maintenance costs (if any). <br /> <br />Responsibilities: <br />Positron shall: <br /> <br />Verify with Santa Ana personnel, Positron recommended computer processor(s), operating <br />system software, third-party software, all associated workstations, printers, communications and <br />related components. <br /> <br />Assign a hardware technician to review all hardware, operating system software and third-party <br />products. <br /> <br />Prepare a final hardware and operating system software deliverables list, thus amending Project <br />Deliverables as appropriate. <br /> <br />Review Santa Ana's existing communications environment to ensure compatibility wnh the <br />equipment and subsystems proposed, and make recommendations as applicable to meeting <br />these requirements. <br /> <br />e. Review Santa Ana's mobile data device types for police and fire and certify that they are compliant <br />with Positron's minimum hardware requirements for optimal application use. <br /> <br />f. Pre-plan installation activities with Santa Ana and all subcontractors. <br /> <br />Santa Ana shall: <br /> <br />a. Provide, upon request, information on existing hardware and operating system software <br />components and terminal networks, as well as projected utilization statistics and other information <br />as is reasonably required to validate final hardware requirements. <br /> <br />b. Review the final hardware and operating system software configuration with the Positron project <br />team. <br /> <br />c. Review Positron's recommendations regarding any existing communications networks and <br />workstations and make any and all necessary modifications identified by Positron to ensure <br />compatibility with the eqUipment and system to be installed. <br /> <br /> <br />\.. <br /> <br />Completion CrIteria: <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.