My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit A: Statement of Work <br /> <br />\...: <br /> <br />Review wRh Santa Ana personnel the specific Positron CAD application functionality. <br /> <br />Identify, in writing on the action item log, site-specific alterations that will be made as part of the <br />standard installation process (i.e., changing headers and footers to read "City of Santa Ana Police <br />Department", etc.). <br /> <br />Provide an on-sRe working demonstration of the product for review (not merely written material). <br /> <br />Review with City personnel outstanding configuration requirements and provide written assurance <br />that such changes will be included in the next Positron CAD version release. <br /> <br />Santa Ana shall: <br /> <br />a, <br /> <br />b, <br /> <br />c. <br /> <br />d, <br /> <br />a. Assign dispatch personnel to attend the pre-configuration review. <br />b. Identify requirements for future implementation, based on Positron's RFP responses. <br /> <br />Completion Criteria: <br /> <br />This task is oonsidered complete when Positron has identified all oonfigurable options for the CAD <br />application, has documented the site-specific changes to be included in the base implementation and has <br />identified those modifications that will be provided as part of the next Positron CAD release. <br /> <br />Task 1-D: <br /> <br />GeoFlle (MAP) Build WorkshOp <br /> <br />Objective: <br /> <br />To initiate the development of a final geographic file resource for use by the Positron <br />products , <br /> <br />\..r Task Description: <br /> <br />The workshop will enable Santa Ana to provide existing ArcView Shape Files and other material to be <br />used for the creation of boundary maps. <br /> <br />Responsibilities: <br /> <br />PosRron shall: <br /> <br />a. Conduct an initial conference call to discuss and evaluate source data and source maps. <br /> <br />b. Conduct an initial conference call to oollectlcreate service boundary data and to discuss service <br />boundary delineation requirements and how they are used in CAD. <br /> <br />c. After assessing the data, source maps, and issues discussed during Kick-off, a Geofile Project <br />Plan will be created. The Geofile Project Plan outlines the build approach and will be submitted to <br />Santa Ana for review. <br /> <br />d. Create a document with a complete description of the process for data creation, maintenance and <br />updates. <br /> <br />e. Discuss and resolve all outstanding issues related to the final Geofile Project Plan within five <br />business days of receipt of any changes requested by Santa Ana, <br /> <br />Santa Ana shall: <br /> <br />\",.. a. <br /> <br />Supply Positron with existing ArcView mapping data. <br /> <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.