My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> b. <br />~ c. <br /> d. <br /> <br />\..r <br /> <br />\,... <br /> <br />exhibit A: Statement of Work <br /> <br />Appoint a geofile system administrator to be the single point of contact with Positron to resolve all <br />geofile issues and appoint a backup geofile coordinator to receive training. <br /> <br />Ensure that all necessary GIS resources are made available to Positron. <br /> <br />Carefully review the proposed final Geofile Project Plan with Positron personnel and provide any <br />requested changes within five business days of the delivery of the plan. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete once Santa Ana and Positron have reviewed and finalized a Geofile <br />Project Plan. <br /> <br />Task l-E: <br /> <br />Requirements Validation process for CAD, MObile, and Interfaces <br /> <br />Objective: <br /> <br />Review and subsequently document system tailoring and configuration requirements for <br />the following: CAD, Mobile and any interfaces provided under this agreement. <br /> <br />Task Description: <br /> <br />Positron will begin preparation of the system specification and interface control documentation for all <br />supplied software and interfaces. <br /> <br />Review meetings will be held for each application subsystem to be installed in order to validate all <br />requirements for tailoring, configuration and the implementation of extemal interfaces as identified in the <br />above referenced proposal and the interface control document. <br /> <br />Using Positron's Functional System Description documents and the interface control document (ICD), <br />Positron will work with the appropriate Santa Ana staff to validate and document all tailoring and <br />configuration requirements for each subsystem and for each interface to be installed. This information will <br />be summarized in a Change List document to be mutually agreed upon by Positron and Santa Ana. <br /> <br />Santa Ana considers standard system tailoring to include the renaming of agency-specific data elements <br />and the refonnatting of existing data-entry screens, as well as defining site-specific parameters. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. <br /> <br />Review, with Santa Ana personnel, Positron's Functional System Description documents and <br />validate those items to be tailored and configured. <br /> <br />Conduct detailed system demonstrations where necessary to aid in the requirements validation <br />process. <br /> <br />Review the CAD and Mobile Functional System Description documents with the appropriate Santa <br />Ana personnel and document any changes and/or corrections that are mutually agreed upon in a <br />Change List. <br /> <br />Analyze, with Santa Ana personnel, the interface control document included as an exhibit to the <br />contract. <br /> <br />Submit the Change List to Santa Ana within thirty (30) business days of completion of the <br />Requirements Validation Session for each subsystem. ~ <br /> <br />Address any deficiencies identified by Santa Ana in the Change List within ten (10) business days. . <br />Exceptions to this tenn can be negotiated between the respective Project Managers at their <br />discretion. <br /> <br />b. <br /> <br />c. <br /> <br />d. <br /> <br />e. <br /> <br />f. <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.