My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit A: Statement of Work <br /> <br />'- <br /> <br />. Mobile - CLETS/Orange County/NCICINLETS (via Datamaxx) <br />. Mobile _ Positron CAD (Digital dispatch, status updates, status reports, self-initiated calls, and <br />other functionality as outlined in the Functional System Description ). <br /> <br />Santa Ana shall: <br /> <br />a. Provide requested information on record layouts and documents necessary to establish interfaces <br />with all local and remote systems and facilities at least thirty (30) days prior to scheduled interface <br />work. <br /> <br />b. Provide and install all communications lines and equipment not provided by Positron as <br />deliverables according to the contract documents. <br /> <br />c. Ensure that necessary certifications, approvals and other related issues will be completed by <br />Santa Ana at least thirty (30) calendar days prior to scheduled interface work. <br /> <br />d. Provide all required liaison support with the agencies and vendors required to support the <br />interfaces. <br /> <br />e. Ensure that the necessary technical support is made available for installation, testing and <br />demonstration of the interfaces. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when each interface is installed and unit tested. The operation or <br />availability of the extemal system or third-party software/hardware is necessary for task completion. <br /> <br />Task B-A: <br /> <br />Software Receipt and Installation <br /> <br />\..r <br /> <br />Objective: <br /> <br />Install, configure and demonstrate software necessary for the operation of the Positron's <br />mobile client. <br /> <br />Task Description: <br /> <br />During this phase, the message switch software will be installed and performance certification completed <br />on the system hardware. All applicable software, as well as equipment vendor's operating system <br />software, necessary for this phase of the project to be completed, will be loaded on Santa Ana's server <br />equipment. <br /> <br />Responsibilities: <br /> <br />Posllron shall: <br /> <br />a. Provide Santa Ana with an inventory list, including serial numbers, of all equipment delivered to <br />Santa Ana related to the scope of services. <br /> <br />b. Configure and install the mobile client, to include the operating system software, the <br />communications PC card and TCPIIP configuration and peripheral equipment (i.e., workstations) <br />In City. <br /> <br />c. Configure message switch including address and user tables. <br /> <br />d. Conduct the following on-site testing: <br /> <br />\",. <br /> <br />. Wireless Connectivity <br />. Messaging <br />. CLETS/Orange County/NCIC Connectivity <br /> <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.