My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />exhibit A: Statement of Work <br /> <br />\.. <br /> <br />Santa Ana has made every effort to include interface specification requirements in the attached <br />interface control document. However, Positron is responsible for identifying and requesting all <br />information necessary to successfully install and test every interface identified within this task and <br />the Interface Control Document sixty (60) days prior to installation. <br /> <br />Santa Ana shall: <br /> <br />a. Provide requested information on record layouts and documents necessary to establish <br />interfaces wRh all local and remote systems and facilities at least thirty (30) days prior to <br />scheduled interface work. <br /> <br />b. Provide and install all communications lines and equipment not provided by Positron as <br />deliverabies according to the contract documents. <br /> <br />c. Ensure that necessary certifications, approvals and other related issues will be completed by <br />Santa Ana at least thirty (30) calendar days prior to scheduled interface work. <br /> <br />d. Provide all required liaison support with the agencies and vendors required to support the <br />interfaces. <br /> <br />e. Ensure that the necessary technical support is made available for installation, testing and <br />demonstration of the interfaces. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when each interface is installed and unR tested. The operation or <br />availability of the external system or third-party software is necessary for task completion. <br /> <br />Task 5: <br /> <br />Mobile Implementation <br /> <br />~ <br /> <br />Install, configure and demonstrate Mobile functionality. <br /> <br />Objective: <br /> <br />Task Description: <br /> <br />Positron will provide the Mobile software, to provide messaging via CAD/Mobile Chat software, logging, <br />syntax translation (require definition and specification), and security capabilities for Mobile Data <br />Computers (MDCs), as outlined in the Functional System Description, including the following interfaces: <br /> <br />. Mobile - Wireless infrastructure <br />. Mobile - CLETS/Orange County/NCIC/NLETS (via Datamaxx) <br />. Mobiie - Positron CAD (Digital dispatch, status updates, status reports, self-initiated calls, and <br />other functionality as outlined in the Functional System Description). <br /> <br />The software license will support site license mobile units. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Request record layouts and documents necessary to establish interfaces with all local and remote <br />systems and facilities at least seventy five (75) days prior to scheduled interface work. <br /> <br />b. Design, develop, transfer, install, tailor and unit test all software required for the following mobile <br />subsystem interfaces resulting in their operating in accordance with the Functional System <br />Description, Change List and Interface Control Documents: <br /> <br />\.. . Mobile - Wireless infrestructure <br /> <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.