My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit A: Statement of Work <br /> <br />\-- <br /> <br />e. <br /> <br />Ana training classes. <br />The number and duration of training classes to be provided are as identified in the Training Plan. <br /> <br />Santa Ana shall: <br /> <br />a. Designate and assign personnel to receive training in groups not to exceed the class size listed in <br />the table above. <br /> <br />b. Santa Ana will provide the necessary classrooms, facilities, materials, copies of documentation, <br />networks and lines to data terminals, personal computers and PC opereting system software, and <br />related equipment to support training classes. This includes one full-function workstation per <br />student, one full-function workstation for the instructor, an LCD, a projection screen, a wMeboard <br />and connectivity to the server. <br /> <br />c. Provide sufficient copies of the documentation supplied by Positron to support all students in the <br />training classes. <br /> <br />d. Ensure that appropriate Santa Ana Training personnel are available to actively participate in the <br />scheduled training programs. <br /> <br />e. Ensure that Santa Ana personnel to receive CAD training are profiCient in the use of Microsoft <br />Windows functionality. <br /> <br />f. Provide any desired video taping equipment and services for the purpose of taping training <br />classes for the purpose of future training of Santa Ana staff. <br /> <br />g. Assume responsibility for travel and per diem expenses for Santa Ana staff for any off-site training <br />classes selected by Santa Ana. <br /> <br />~ <br /> <br />Completion Crtteria: <br /> <br />This task is considered complete when the scheduled technical and user training, both user and technical <br />is completed. <br /> <br />Task 8-0: <br /> <br />Positron MobIle Acceptance Testing <br /> <br />ObJective: <br /> <br />Perform functional tests of Positron Mobile applications. <br /> <br />Task Description: <br /> <br />Demonstrate the applicable functions and features of the mobile functionality as defined in the Positron <br />specification documents, Santa Ana's configuration requirements and the Positron Acceptance Test Plan. <br />Santa Ana staff will perform functional testing of the Positron subsystem. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. <br /> <br />Utilize the Positron specification documents, Santa Ana's configuration requirements and the <br />Positron Acceptance Test Plan as a guideline for all functional tests. <br /> <br />Certify all applicable software, subsystems and ancillary systems as ready for functional testing. <br /> <br />Demonstrate the tailored and configured functions of the installed subsystem. <br /> <br />Review any discrepancies in functionality identified by Santa Ana. Software or documentation shall <br />be corrected prior to Positron Final Certification as needed to correct the discrepancies as <br />identified. <br /> <br />b. <br /> <br />c. <br /> <br />d. <br /> <br />\-- <br /> <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.