Laserfiche WebLink
<br />Exhibit A: Statement of Work <br /> <br />Santa Ana shall: <br /> <br />~ <br /> <br />a. <br />b. <br /> <br />Generate test data files needed for functional testing. <br /> <br />Verify each function identified in the Positron specification documents, Santa Ana's configuration <br />requirements and the Positron Acceptance Test Plan to its operation as documented. <br /> <br />Document each discrepancy of functionality located between tested criteria and the Positron <br />specification documents, Santa Ana's configuration requirements and the Positron Acceptance <br />Test Plan. <br /> <br />Work with Positron to identify the type of correction needed to ensure that each subsystem <br />conforms to the Positron specification documents, Santa Ana's configuration requirements and <br />the Positron Acceptance Test Plan. <br /> <br />c. <br /> <br />d. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when Positron's mobile system has been demonstrated to operate in <br />accordance wnh the Positron specification documents, Santa Ana's configuration requirements and the <br />Positron Acceptance Test Plan on six (6) Santa Ana-supplied MDCs (the installation of the mobile <br />software on the remaining Santa Ana-supplied MDCs is not required for task completion). <br /> <br />Task 8-E: <br /> <br />Deliver Positron Mobile As-Built Spedficatlon Documents <br /> <br />'-' <br /> <br />Document and deliver the Positron As-BuiU Specification Documents supplemented by <br />documentation that will support the user's utilization of the subsystem. <br /> <br />Task Description: <br /> <br />ObJective: <br /> <br />Positron will modify the baseline specification and interface control documents to reflect the specific <br />changes required for implementation. Positron will supplement the documentation above to support the <br />user's utilization of the application. At a minimum, the supplemental documentation will include a schema, <br />data dictionary and error code dictionary. Other features will be mutually agreed to between the City and <br />Positron. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Prepare final Positron mobile As-Built Specification documents. <br /> <br />b. Prepare final interface control documents for each interface installed. <br /> <br />c. Incorporate mutually agreed-to revisions into the supplemented documentation described above <br />and deliver a set of final documents to Santa Ana. <br /> <br />Santa Ana shall: <br /> <br />a. Review the Positron As-Built specification documents submitted by Positron and identify in writing <br />any specific deficiencies found wnhln twenty (20) business days of receipt. <br /> <br />b. Review the final interface control documents submitted by Positron and identify in writing any <br />specific deficiencies found within twenty (20) business days of receipt. <br /> <br />Completion Criteria: <br />\,..- This task is considered complete upon submittal of the finalized and City accepted Positron as-built <br /> <br /> <br />18 <br />