My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit A: Statement of Work <br /> <br />Santa Ana shall: <br /> <br />~ <br /> <br />a. <br />b. <br /> <br />Generate test data files needed for functional testing. <br /> <br />Verify each function identified in the Positron specification documents, Santa Ana's configuration <br />requirements and the Positron Acceptance Test Plan to its operation as documented. <br /> <br />Document each discrepancy of functionality located between tested criteria and the Positron <br />specification documents, Santa Ana's configuration requirements and the Positron Acceptance <br />Test Plan. <br /> <br />Work with Positron to identify the type of correction needed to ensure that each subsystem <br />conforms to the Positron specification documents, Santa Ana's configuration requirements and <br />the Positron Acceptance Test Plan. <br /> <br />c. <br /> <br />d. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when Positron's mobile system has been demonstrated to operate in <br />accordance wnh the Positron specification documents, Santa Ana's configuration requirements and the <br />Positron Acceptance Test Plan on six (6) Santa Ana-supplied MDCs (the installation of the mobile <br />software on the remaining Santa Ana-supplied MDCs is not required for task completion). <br /> <br />Task 8-E: <br /> <br />Deliver Positron Mobile As-Built Spedficatlon Documents <br /> <br />'-' <br /> <br />Document and deliver the Positron As-BuiU Specification Documents supplemented by <br />documentation that will support the user's utilization of the subsystem. <br /> <br />Task Description: <br /> <br />ObJective: <br /> <br />Positron will modify the baseline specification and interface control documents to reflect the specific <br />changes required for implementation. Positron will supplement the documentation above to support the <br />user's utilization of the application. At a minimum, the supplemental documentation will include a schema, <br />data dictionary and error code dictionary. Other features will be mutually agreed to between the City and <br />Positron. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Prepare final Positron mobile As-Built Specification documents. <br /> <br />b. Prepare final interface control documents for each interface installed. <br /> <br />c. Incorporate mutually agreed-to revisions into the supplemented documentation described above <br />and deliver a set of final documents to Santa Ana. <br /> <br />Santa Ana shall: <br /> <br />a. Review the Positron As-Built specification documents submitted by Positron and identify in writing <br />any specific deficiencies found wnhln twenty (20) business days of receipt. <br /> <br />b. Review the final interface control documents submitted by Positron and identify in writing any <br />specific deficiencies found within twenty (20) business days of receipt. <br /> <br />Completion Criteria: <br />\,..- This task is considered complete upon submittal of the finalized and City accepted Positron as-built <br /> <br /> <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.