My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit A: Statement of Work <br /> <br />~ Completion Criteria: <br /> <br />This task is complete when the complete CAD configuration is tested and validated by Santa Ana <br />personnel. <br /> <br />a. <br />b. <br />'-r <br />c. <br />d. <br />e. <br /> <br />\." <br /> <br />Task 9: <br /> <br />CAD Subsystem Integration Testing <br /> <br />Objective: <br /> <br />Perform integration testing of the CAD subsystem, Mobile and other interfaces. <br /> <br />Task Description: <br /> <br />Demonstrate all internal and external interfaces to ensure that the combined CAD subsystem, and Mobile <br />application operate as defined in the CAD documentation, the original and amended Positron Mobile <br />documentation, Positron's CAD ATP, Positron's ATP and the interface control document. Santa Ana staff <br />will conduct the integration testing. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />Certify the interfaces as ready for integration testing. <br /> <br />Demonstrate all inter-system communications between installed Positron systems and between <br />Positron and non-Posnron systems, according to the CAD Specification documentation, the <br />original and amended Positron Mobile documentation, Posnron's CAD ATP, Positron's ATP and <br />the interface control document. <br /> <br />Assist Santa Ana in testing each interface. <br /> <br />Review and correct any discrepancies that are identified by Santa Ana prior to final system <br />acceptance and payment. <br /> <br />Provide software or documentation corrections as needed to correct the discrepancies prior to <br />CAD Final Certification. <br /> <br />Santa Ana shall: <br /> <br />a. Conduct test procedures and verify all inter-system communications between installed Positron <br />systems and between Positron and non-Positron systems to ensure conformance with the <br />approved CAD documentation, the original and amended Positron Mobile documentation, <br />Posnron's CAD ATP, Positron's ATP and the interface control document. <br /> <br />b. Identify in writing each discrepancy between subsystem and ancillary system functionality and the <br />CAD documentation, the original and amended Positron Mobile documentation, Positron's CAD <br />ATP, Positron's ATP and the interface control document within ten (10) business days. <br /> <br />c. Work with Positron to identify the type of correction needed to ensure that each subsystem and <br />ancillary system conforms to the CAD documentation, the original and amended Positron Mobile <br />documentation, Positron's CAD A TP, Positron's A TP and the interface control document. <br /> <br />Completion Criteria: <br /> <br /> <br />This task is considered complete when the following internal and external interfaces and other Positron <br />licensed software has been verifiably operational according to the CAD documentation, the original an <br />amended Posnron Mobile documentation, Positron's CAD ATP, Positron's ATP and the interface contro <br />document: <br /> <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.