Laserfiche WebLink
<br />Exhibit A: Statement of Work <br /> <br />~ Completion Criteria: <br /> <br />This task is complete when the complete CAD configuration is tested and validated by Santa Ana <br />personnel. <br /> <br />a. <br />b. <br />'-r <br />c. <br />d. <br />e. <br /> <br />\." <br /> <br />Task 9: <br /> <br />CAD Subsystem Integration Testing <br /> <br />Objective: <br /> <br />Perform integration testing of the CAD subsystem, Mobile and other interfaces. <br /> <br />Task Description: <br /> <br />Demonstrate all internal and external interfaces to ensure that the combined CAD subsystem, and Mobile <br />application operate as defined in the CAD documentation, the original and amended Positron Mobile <br />documentation, Positron's CAD ATP, Positron's ATP and the interface control document. Santa Ana staff <br />will conduct the integration testing. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />Certify the interfaces as ready for integration testing. <br /> <br />Demonstrate all inter-system communications between installed Positron systems and between <br />Positron and non-Posnron systems, according to the CAD Specification documentation, the <br />original and amended Positron Mobile documentation, Posnron's CAD ATP, Positron's ATP and <br />the interface control document. <br /> <br />Assist Santa Ana in testing each interface. <br /> <br />Review and correct any discrepancies that are identified by Santa Ana prior to final system <br />acceptance and payment. <br /> <br />Provide software or documentation corrections as needed to correct the discrepancies prior to <br />CAD Final Certification. <br /> <br />Santa Ana shall: <br /> <br />a. Conduct test procedures and verify all inter-system communications between installed Positron <br />systems and between Positron and non-Positron systems to ensure conformance with the <br />approved CAD documentation, the original and amended Positron Mobile documentation, <br />Posnron's CAD ATP, Positron's ATP and the interface control document. <br /> <br />b. Identify in writing each discrepancy between subsystem and ancillary system functionality and the <br />CAD documentation, the original and amended Positron Mobile documentation, Positron's CAD <br />ATP, Positron's ATP and the interface control document within ten (10) business days. <br /> <br />c. Work with Positron to identify the type of correction needed to ensure that each subsystem and <br />ancillary system conforms to the CAD documentation, the original and amended Positron Mobile <br />documentation, Positron's CAD A TP, Positron's A TP and the interface control document. <br /> <br />Completion Criteria: <br /> <br /> <br />This task is considered complete when the following internal and external interfaces and other Positron <br />licensed software has been verifiably operational according to the CAD documentation, the original an <br />amended Posnron Mobile documentation, Positron's CAD ATP, Positron's ATP and the interface contro <br />document: <br /> <br />21 <br />