My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />\..r <br /> <br />b. <br /> <br />c. <br /> <br />d. <br /> <br />e. <br /> <br />Exhibit A: Statement of Work <br /> <br />functional testing. <br /> <br />Certify all applicable software and subsystems as ready for functional testing. <br /> <br />Review any discrepancies in functionality identified by Santa Ana. <br /> <br />Software or documentation shall be corrected prior to CAD Final Certification as needed to correct <br />the discrepancies as identified. <br /> <br />Test the baseline functionality of the CAD subsystem according to an agreed upon set of testing <br />scenarios. <br /> <br />Santa Ana shall: <br /> <br />a. Generate production data files needed for functional testing. <br /> <br />b. Document each discrepancy between the CAD subsystem functionality and the RFP response <br />and the system acceptance test plan material. <br /> <br />c. Work with Positron to identify the type of correction needed to ensure that the subsystem <br />conforms to the testing cr~eria. <br /> <br />~ <br /> <br /> a. <br /> b. <br /> c. <br /> d. <br /> e. <br />\... f. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when CAD has been demonstrated to operate in accordance with the <br />Positron RFP response and the system acceptance test plan cr~eria. <br /> <br />Task 8: <br /> <br />Final CAD Equipment Installation <br /> <br />Objective: <br /> <br />Install all remaining cables, modems, hubs, routers, printers, workstations and other <br />equipment required for production operation. <br /> <br />Task Description: <br /> <br />Prior to CAD Subsystem Integration Testing, all remaining computer, communications and related <br />components will be installed. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Deliver all remaining Positron-supplied equipment. <br />b. Install all remaining Positron-supplied network, cabling and associated equipment. <br /> <br />Santa Ana shall: <br /> <br />Provide, configure and install all remaining equipment not provided by Positron prior to Positron's <br />arrivai for monitoring subsystem Integration testing. <br /> <br />Complete any required console and related modifications. <br /> <br />Provide and install all network cables not provided by Positron and verify both network and PC <br />operation. <br /> <br />Perform any site modifications to allow successful equipment installation <br /> <br />Provide and install all necessary UPS equipment not provided by Positron. <br /> <br />Install and verify the operation of all Santa Ana-installed workstation operating system software. <br /> <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.