<br />\..r <br /> <br />b. <br /> <br />c. <br /> <br />d. <br /> <br />e. <br /> <br />Exhibit A: Statement of Work <br /> <br />functional testing. <br /> <br />Certify all applicable software and subsystems as ready for functional testing. <br /> <br />Review any discrepancies in functionality identified by Santa Ana. <br /> <br />Software or documentation shall be corrected prior to CAD Final Certification as needed to correct <br />the discrepancies as identified. <br /> <br />Test the baseline functionality of the CAD subsystem according to an agreed upon set of testing <br />scenarios. <br /> <br />Santa Ana shall: <br /> <br />a. Generate production data files needed for functional testing. <br /> <br />b. Document each discrepancy between the CAD subsystem functionality and the RFP response <br />and the system acceptance test plan material. <br /> <br />c. Work with Positron to identify the type of correction needed to ensure that the subsystem <br />conforms to the testing cr~eria. <br /> <br />~ <br /> <br /> a. <br /> b. <br /> c. <br /> d. <br /> e. <br />\... f. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when CAD has been demonstrated to operate in accordance with the <br />Positron RFP response and the system acceptance test plan cr~eria. <br /> <br />Task 8: <br /> <br />Final CAD Equipment Installation <br /> <br />Objective: <br /> <br />Install all remaining cables, modems, hubs, routers, printers, workstations and other <br />equipment required for production operation. <br /> <br />Task Description: <br /> <br />Prior to CAD Subsystem Integration Testing, all remaining computer, communications and related <br />components will be installed. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Deliver all remaining Positron-supplied equipment. <br />b. Install all remaining Positron-supplied network, cabling and associated equipment. <br /> <br />Santa Ana shall: <br /> <br />Provide, configure and install all remaining equipment not provided by Positron prior to Positron's <br />arrivai for monitoring subsystem Integration testing. <br /> <br />Complete any required console and related modifications. <br /> <br />Provide and install all network cables not provided by Positron and verify both network and PC <br />operation. <br /> <br />Perform any site modifications to allow successful equipment installation <br /> <br />Provide and install all necessary UPS equipment not provided by Positron. <br /> <br />Install and verify the operation of all Santa Ana-installed workstation operating system software. <br /> <br /> <br />20 <br />