My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit A: Statement of Work <br /> <br />test period of 99.9% or better for a thirty (30) day Subsystem Reliability Test period, commencing at the <br />completion of CAD Production Cutover. <br /> <br />\w <br /> <br />Task 13: <br /> <br />CAD Refresher Training <br /> <br />Objective: <br /> <br />Provide CAD Refresher Training. <br /> <br />Task Description: <br /> <br />Positron will provide five (5) consecutive days of on-site Refresher Training post Final Certification <br />according to mutually agreed-to content and schedule. At Santa Ana's option, "training" may be in the form <br />of on-site Positron personnel working one-on-one or with a group of Santa Ana personnel at their <br />workstations. Schedule of hours will be varied so as to afford both day-watch and night-watch Santa Ana <br />personnel access to on-site Positron personnel. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Provide CAD Refresher Training for Santa Ana Technical and/or Training staff members. Training <br />will be provided on-site for a consecutive five (5) day period (not to exceed eight (8) hours per <br />twenty-four (24) hour period). <br /> <br />b. Allow Santa Ana to videotape Refresher Training classes for the purpose of presentation to future <br />Santa Ana training classes. <br /> <br />Santa Ana shall: <br /> <br />a. <br />\w <br />b. <br />c. <br />d. <br />e. <br />f. <br /> <br />Designate and assign personnel to receive training in groups not to exceed the class sizes listed <br />in the attached Training Plan. <br /> <br />Provide suitable classroom facilities with computer workstation equipment for each staff member <br />participating in the training session. <br /> <br />Provide sufficient copies of the documentation supplied by Positron to support all students in the <br />training classes. <br /> <br />Ensure that appropriate Santa Ana Training personnel are available to actively participate in the <br />SCheduled training programs. <br /> <br />Ensure that Santa Ana personnel to receive CAD training are profiCient in the use of Microsoft <br />Windows functionality. <br /> <br />Provide any desired video taping equipment and services for the purpose of taping training <br />classes for the purpose of future training of Santa Ana staff. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete upon completion of five (5) consecutive days of Positron-provided on-site <br />Refresher Training. <br /> <br />Task 14: <br /> <br />Total System Integration Validation <br /> <br />Objective: <br /> <br />Provide System-Wide validation of performance as identified in the Positron RFP <br />response, the as-built documentation, the interface control document, and the acceptance <br />test plans. <br /> <br />\..- <br /> <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.