My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 8:46:28 AM
Creation date
1/9/2006 5:04:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Positron
Contract #
A-2004-229
Agency
Police
Council Approval Date
10/18/2004
Insurance Exp Date
12/31/2200
Notes
PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit A: Statement of Work <br /> <br />l. . Subsystem operation will be suspended, the problem is considered "major," and immediately <br />- diagnosed and corrected. After installation of the appropriate corrections, the test period will <br />resume, logging the time since Positron was notified of the failure as downtime, or <br /> <br />. Subsystem operation will continue, the problem will be logged and then corrected, tested and <br />demonstrated during the reliability test period. In this case, the problem is documented as a <br />"minor" system problem, the subsystem not removed from on-line operation, and the subsystem is <br />not considered down. <br /> <br />\..: <br /> <br />No software, related subsystem changes or enhancements shall be made to any subsystem undergoing <br />subsystem certification unless they are directly related to addressing a "major" failure. <br /> <br />The Reliability Testing process can be temporarily suspended upon agreement between Santa Ana and <br />Positron for scheduled changes, software corrections or upgrades. In this event, the test period will <br />resume when the subsystem is again operational, without logging downtime. <br /> <br />During the test period, Positron will develop a list of "minor" subsystem problems as described above. This <br />list will be completed and delivered to Santa Ana within five (5) business days following the completion of <br />the subsystem certification phase. These items, plus any others that are found as the subsystem moves <br />into full production operation, will be addressed and corrected in a timely manner (according to an agreed- <br />to schedule) during this period of operation or as part of the warranty period. The resolution of "minor" <br />subsystem problems will not delay the completion of this task. Any further subsystem problem or <br />inconsistency with the functional requirements will be addressed under the provisions of the warranty. <br /> <br />When Positron has corrected and demonstrated all significant functional and operational errors and areas <br />of non-rompliance that have been identified on the action item list during the test period, the individual <br />subsystems will be accepted and made available for continuing productive use. Any additional problems or <br />areas of non-compliance identified following this reliability testing period, including those related to any <br />subsystems or ancillary systems that have not yet been placed in productive operation, will not prevent <br />subsystem certification and will be addressed as part of the standard software warranty. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Identify a point of contact for logging system interruptions that is available 24/7 during the reliability <br />testing period. Develop and complete a list of "minor" subsystem problems for delivery to Santa <br />Ana within five (5) business days following the completion of Reliability Testing. <br /> <br />b. Address and/or correct the "minor" subsystem problems either during this periOd or as a part of <br />the warranty period. <br /> <br />Santa Ana shall: <br /> <br />a. Utilize and monitor the CAD subsystem in a production environment. <br /> <br />b. Prepare the site as necessary (i.e., ensure communication lines are installed and available, any <br />Santa Ana-provided equipment and external systems are operational, etc.). <br /> <br />c. Log all functional problems on an "action item list." <br /> <br />d. Contact Positron personnel in a timely manner in the event of subsystem problems or failures. <br /> <br />e. Begin subsystem monitoring in support of the warranty period. <br /> <br /> <br />Completion Criteria: <br />'- This task is considered complete after CAD has demonstrated critical system availability levels during the <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.