Laserfiche WebLink
<br />Alben Grover & Associates <br /> <br />Project Schedule/Experience and References <br /> <br />PROJECT SCHEDULE <br /> <br />The project schedule, as shown in Figure 2, has been prepared considering all the <br />requirements for the study detailed in the RFP in estimating the time required to <br />complete the project. AGA has adequate staff resources to provide a Draft Report to <br />the City of Santa Ana within twelve weeks from the date of notification to proceed, <br />and a Final Report to the City within two weeks of receipt of comments on the Draft <br />Report. The principal contact for this project for AGA will be Mark H. Miller, P.E., <br />Proj ect Manager. <br /> <br />EXPERIENCE AND REFERENCES <br /> <br />Within the past five years, staff of AGA have completed many engineering and traffic <br />survey projects similar to the project proposed by the City of Santa Ana. Following <br />are project details and references familiar with the work conducted on several of these <br />studies. <br /> <br />Speed Zone Survey - 110 Locations - City of Santa Fe Springs -1999, 2004 <br />Mr. Don K. Jensen <br />Director of Public Works <br />City of Santa Fe Springs <br />1171 0 Telegraph Road <br />Santa Fe Springs, California 90670 <br />(562) 868-0511 <br /> <br />Speed Zone Survey - 202 Locations - City of Santa Clarita - 2000, 2005 <br />Mr. Andrew Yi <br />Traffic Engineer <br />City of Santa Clarita <br />23920 Valencia Boulevard <br />Santa Clarita, California 91355 <br />(661) 255-4942 <br /> <br />Speed Zone Survey - 91 Locations - City of Cerritos - 1998, 2002 <br />Mr. Hal Arbogast <br />Assistant City Engineer <br />City of Cerritos <br />18125 Bloomfield Avenue <br />Cerritos, California 90703-3130 <br />(562) 916-1219 <br /> <br />9 <br />