Laserfiche WebLink
<br />Table AG-1 <br />Land Evaluation/Site Assessment Scoring Thresholds <br /> <br />Total Scoring Scoring Decision <br />0 to 39 Points Not Considered Significant <br />40 to 59 Points Considered Significant only <br /> if Land Evaluation and Site <br /> Assessment subscores are each <br /> greater than or equal to 20 <br /> points <br />60 to 79 Points Considered Significant unless <br /> either Land Evaluation or <br /> Site Assessment subs core is <br /> less than 20 points <br />80 to 100 Points Considered Significant <br /> <br />Project Determination <br /> <br />Table AG-2 indicates that the project site was determined <br />to have final LESA Score of 65. Based on the thresholds <br />identified in Table AG-1, the agricultural resources on the <br />project site are not considered significant because the <br />Site Assessment factor is less than 20 points. Therefore, <br />the implementation of the proposed project would not result <br />in the loss of any prime or unique agriculture lands. <br /> <br />Table AG-2 <br />Final LESA Score sheet <br /> <br />Factor Name Factor Factor Weighted <br /> Rating Weighting Factor Rating <br />LAND EVALUATION <br />Land Capability 100 .25 25 <br />Classification <br />Storie Index Rating 100 .25 25 <br />SITE ASSESSMENT <br />Project Size 0 .15 0 <br />Water Resource 100 .15 15 <br />Availability <br />Surrounding 0 .15 0 <br />Agricultural Lands <br />Protected Resource 0 .15 0 <br />Lands <br />TOTAL 65 <br /> <br />6 <br /> <br />31A,.,21 <br /> <br />