Laserfiche WebLink
<br />Table A-1 <br />EMISSION THRESHOLDS OF SIGNIFICANCE <br /> <br /> Project <br />Pollutant Construction Tons/ Operations <br /> Pounds/Day Quarter Pounds/Day <br />Carbon Monoxide 550 24.75 550 <br />Reactive Organic <br />Compounds 75 2.5 55 <br />Nitrogen Oxides 100 2.5 55 <br />Particulate <br />Matter 150 6.75 150 <br /> <br />Long-term Operational Air Quality Impacts <br /> <br />The primary source of long-term operational emissions <br />associated with the proposed project would be generated by <br />vehicle travel to and from the proj ect site. A relatively <br />minor amount of gaseous emissions would also occur from <br />natural gas and electricity usage. The proposed project is <br />consistent with the General Plan. The long-term operational <br />emissions generated by the proposed project would be <br />consistent with the air pollutant emissions projected <br />within the General Plan Land Use Element FEIR. <br /> <br />Short-term constructed Related Air Quality Impacts <br /> <br />Construction operations for the proposed project would <br />involve the grading of approximately 5,000 cubic yards of <br />soil and a limited amount of building construction. Given <br />the minimal amount of grading and construction activity, <br />less than significant construction related air quality <br />impacts are expected. However, dust generated from <br />construction operations could be a nuisance to nearby land <br />uses. To minimize dust impacts during construction, the <br />proposed project would be subject SCAQMD Fugitive Dust Rule <br />403. To insure compliance with Fugitive Dust Rule 403 the <br />following mitigation measure shall be implemented. <br /> <br />Mitigation Measure <br /> <br />· Grading plans and construction plans for the proposed <br />project shall reflect the following notes: <br /> <br />8 <br /> <br />3tA~23 <br />