My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 1701 E. FAIRHAVEN AVE.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
03/06/2006
>
31A - 1701 E. FAIRHAVEN AVE.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:48:21 PM
Creation date
2/28/2006 3:41:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
3/6/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Table A-1 <br />EMISSION THRESHOLDS OF SIGNIFICANCE <br /> <br /> Project <br />Pollutant Construction Tons/ Operations <br /> Pounds/Day Quarter Pounds/Day <br />Carbon Monoxide 550 24.75 550 <br />Reactive Organic <br />Compounds 75 2.5 55 <br />Nitrogen Oxides 100 2.5 55 <br />Particulate <br />Matter 150 6.75 150 <br /> <br />Long-term Operational Air Quality Impacts <br /> <br />The primary source of long-term operational emissions <br />associated with the proposed project would be generated by <br />vehicle travel to and from the proj ect site. A relatively <br />minor amount of gaseous emissions would also occur from <br />natural gas and electricity usage. The proposed project is <br />consistent with the General Plan. The long-term operational <br />emissions generated by the proposed project would be <br />consistent with the air pollutant emissions projected <br />within the General Plan Land Use Element FEIR. <br /> <br />Short-term constructed Related Air Quality Impacts <br /> <br />Construction operations for the proposed project would <br />involve the grading of approximately 5,000 cubic yards of <br />soil and a limited amount of building construction. Given <br />the minimal amount of grading and construction activity, <br />less than significant construction related air quality <br />impacts are expected. However, dust generated from <br />construction operations could be a nuisance to nearby land <br />uses. To minimize dust impacts during construction, the <br />proposed project would be subject SCAQMD Fugitive Dust Rule <br />403. To insure compliance with Fugitive Dust Rule 403 the <br />following mitigation measure shall be implemented. <br /> <br />Mitigation Measure <br /> <br />· Grading plans and construction plans for the proposed <br />project shall reflect the following notes: <br /> <br />8 <br /> <br />3tA~23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.