Laserfiche WebLink
<br />1. All material excavated or graded will be <br />sufficiently watered to prevent excessive amounts <br />of dust. <br /> <br />2. All clearing and earthwork activities shall cease <br />during period of high winds (winds greater than <br />25 mph averaged over one hour) or during Stage 1 <br />or Stage 2 smog episodes. <br /> <br />3. Streets surrounding the proj ect site should be <br />cleaned at the end of each day of construction. <br /> <br />4. All material transported offsite shall either be <br />sufficiently watered or securely covered to <br />prevent excessive amounts of dust. <br /> <br />5. Equipment engines shall be maintained in good <br />condition and in proper tune according to <br />manufacturer's specifications. <br /> <br />c. Result in a cumulatively considerable net increase of <br />any criteria pollutant for which the project region is <br />non-attainment under an applicable federal or state <br />ambient air quality standard? <br /> <br />Less Than Significant Impact <br /> <br />The proposed proj ect would be consistent with the City's <br />General Plan and the local growth forecasts for the Orange <br />County sub region and regional emissions budget developed <br />by the Southern California Association of Governments for <br />the 1999 Air Quality Management Plan. SCAG has determined <br />that the air pollution impacts of any project that conforms <br />to local growth forecasts would be consistent with this <br />forecast and the regional air quality impacts would be <br />adequately mitigated by the Plan to a level considered less <br />than significant. The proposed project is consistent with <br />the General Plan and the South Coast Air Quality Management <br />Plan and therefore would not result in significant <br />cumulative air quality impacts. <br /> <br />D. Expose Sensitive receptors to substantial pollutant <br />concentrations? <br /> <br />Less Than Significant Impact <br /> <br />9 <br /> <br />31Ar,24 <br />