Laserfiche WebLink
<br />D. Work Schedule <br /> <br />1. Provide a narrative of the Consultant's understanding of the scope of <br />work including a work plan showing the relationship of events and a <br />schedule for completing all the requirements set forth in this Request for <br />Proposal. <br /> <br />2. The anticipated project schedule is shown below: <br /> <br />~ <br /> <br /> PROPOSED SCHEDULE <br /> School Area Pedestrian Safet' Study - CityWide <br /> JUL AUG SEP OCT NOV DEC JAN FEB <br />TASK 2000 2000 2000 2000 2000 2000 2001 2001 <br />OA. RFP & Consultant *** *** <br /> Selection (City) <br />1. Radar Speed Surveys *** *** <br />2. Field Review & Data *** *** <br /> Collection <br />3. Analysis *** *** <br />4A. Draft Reoort *** <br />OB. City's Review * *** <br />4B. Final Reoort *** <br />5. Sketches for Sign *** <br /> Changes <br /> <br />* NOTE: If survey data seems either unusually high or low, the City may require such <br />locations to be resurveyed at no additional cost to the City . <br /> <br />E. References <br /> <br />Consultant shall provide a list of at least two (2) references of previous, recent <br />related projects, with the name of the agency, the name of a contact person and <br />their current address and telephone number. <br /> <br />F. Insurance <br /> <br />With respect to performance of work for this project, the Consultant shall <br /> <br />4 <br />