My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Willdan, Inc. 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
W-X (INACTIVE)
>
Willdan, Inc. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:57:18 PM
Creation date
5/9/2003 4:16:27 PM
Metadata
Fields
Template:
Contracts
Company Name
Willdan, Inc.
Contract #
A-2001-113C
Agency
Public Works
Council Approval Date
6/4/2001
Expiration Date
12/31/2003
Insurance Exp Date
11/9/2004
Destruction Year
2011
Notes
Amended by A-2003-067
Document Relationships
Willdan, Inc. 1a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;1Pf; City of Santa Ana <br />On -Call Traffic Engineering <br />• Prepare an Intemet-compatible format of the Tool Kit. <br />• Assist City staff in integrating the pedestrian safety program the City's <br />Leadership Training Curriculum Binder. <br />• Develop of multilingual interactive display from the current display. <br />• Assist the Task Force in working with school districts on pedestrian safety. <br />This would include review of "Suggested Route to School" maps. <br />• Assist Task Force in developing and implementing a program to sponsor <br />at least two speakers per year on pedestrian safety. <br />D.OTS Project No. PS-0120, Pedestrian Safety <br />Analysis: Update and Awareness Program <br />As indicated in the "Method of Procedure" section of OTS Project No. PS0120, <br />the specific tasks for the consultant are to be determined by the Traffic <br />Engineering Staff, in conjunction with the Consultant. The following are general <br />descriptions of the work envisioned for this project. <br />• Meet with City traffic engineering staff and Task Force to determine <br />specific tasks. <br />• Assist in the Pedestrian Safety study, including data collection and <br />analyses and preparation of a report. <br />• Develop guidelines for installation of marked crosswalks. <br />• Prepare a summary report for posting on the City's website. <br />• Analyze mid -block pedestrian collisions, identify common factors, and <br />recommend actions to reduce these types of crashes. <br />• A subconsultant will be selected at a later date to assist the City in the <br />Public Education Phase of the project. <br />^^ WILLDAN s_16 <br />, , Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.