Laserfiche WebLink
City of Santa Ana <br />On -Call Traffic Engineering <br />8. Submit application and background information to County for review. <br />9. Revise application per County direction. <br />10.Submit final application (Mailed, courier, e-mail, faxed as requested) and <br />finalize task paperwork. <br />Schedule of Work <br />SIDEWALK — PREPARATION OF SR2S GRANT APPLICATIONS <br />DESIGN AND DRAFT PLANS <br />REGISTERED ENGINEER 1 <br />DRAFTSPERSON 12 <br />SENIOR DESIGNER 24 <br />SPECIFICATIONS & ESTIMATE <br />PRINCIPAL ENGINEER 16 <br />TYPIST 4 <br />CROSSWALK — PREPARATION OF SR2S GRANT APPLICATIONS <br />DESIGN AND DRAFT PLANS <br />PRINCIPAL ENGINEER 1 <br />REGISTERED ENGINEER 16 <br />ASST. LEVEL DESIGN ENGINEER 20 <br />DRAFTSPERSON 16 <br />SPECIFICATIONS & ESTIMATE <br />PRINCIPAL ENGINEER 16 <br />TYPIST 4 <br />COTS Project No. PSO1 19, Pedestrian Safety Task <br />Force Program <br />As indicated in the "Method of Procedure" section of OTS Project No. PS0119, <br />the specific tasks for the consultant are to be determined by the Traffic <br />Engineering Staff and Santa Ana Pedestrian Task Force. The following are <br />general descriptions of the work envisioned for this project. <br />• Meet with City traffic engineering staff and Task Force to determine <br />specific tasks. <br />• Review and learn the operation of the Task Force and document those <br />activities for future use. <br />• Continue work of Task Force, including meetings, coordination of <br />pedestrian safety activities, and collection and distribution of information. <br />• Review and recommend revisions to Pedestrian Safety Tool Kit and <br />produce a final product. <br />• Review trial use of Tool Kit and modify to develop a final procedure. <br />^^ WILLDAN <br />... _ Page 15 <br />