Proposal to Prepare an EIR and Provide Planning Consulting Services for the <br />First and Fourth Street Corridors Mixed -Use Overlay Zone <br />Subtask 4b: Distribute Draft EIR <br />EIP will provide the City with fifty (50) copies of the Draft EIR after the City approves final drafts, <br />including the fifteen (15) copies (as required by the Governor's Office of Planning and Research/State <br />Clearinghouse) of the Draft EIR to be filed at the State Clearinghouse. It is assumed that the City (or <br />the Applicants) would be responsible for preparation of the Notice of Completion and any filing fees. <br />OUTPUT <br />1. Distribute fifty (50) bound copies of the Draft EIR for public review (this number includes the copies <br />of the Draft EIR that are submitted to the State Clearinghouse). Should the City determine that <br />additional copies of the Draft EIR are necessary; their production would be treated as an Optional <br />Task. <br />2. Provide one (1) clean reproducible original of the Draft EIR and one (1) electronic copy. <br />TASK 5: PREPARE ADMINISTRATIVE FINAL BRAND DRAFT MMP RESPONSE TO DRAFT <br />EIR COMMENTS) <br />This task will result in the preparation of a Preliminary Final EIR, which will contain a list of commenters, <br />comment letters, responses to comments on the Draft EIR, Draft EIR text revisions, the Draft EIR itself, <br />and the Draft Mitigation Monitoring Program (MMP). <br />Subtask 5a: Prepare Administrative Final EIR (Response to Comments) <br />The City's project planner will compile and transmit all written comments on the Draft EIR throughout <br />the public review period and as one unified set of comments following the close of the public review <br />period. EIP will confer with City staff to review written comments on the Draft EIR, including comments <br />from public meetings and hearings, to develop a general strategy for preparation of responses. The <br />Administrative Final EIR will be submitted to City staff for review and comment. <br />Subtask 5b: Prepare Draft MMP <br />The objective of this subtask is to ensure compliance with Public Resources Code Section 21081.6, as <br />mandated by Assembly Bill 3180 (Cortese 1988), which requires a lead agency to adopt a mitigation <br />monitoring program (MMP) at the time an EIR is certified. <br />EIP will prepare a Draft MMP concurrently with the preparation of the Administrative Final EIR, upon <br />finalization of project mitigation measures. The MMP will be designed to ensure compliance with all <br />adopted mitigation measures during project implementation. The MMP will be in table format, and will <br />specify mitigation measures, standards of success, conditions of approval, parties responsible for <br />implementation and monitoring, funding sources, timing and frequency, criteria to determine <br />compliance with conditions, and provisions for remedial measures (if the success standards are not <br />achieved). <br />The MMP will be designed to fit into the Citys existing entitlement and project review process <br />