My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EIP ASSOCIATES 6
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
E-F (INACTIVE)
>
EIP ASSOCIATES 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 4:29:41 PM
Creation date
4/12/2006 1:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
EIP Associates dba Post, Buckley, Schuh & Jernigan, Inc. (PBS&J)
Contract #
A-2006-021
Agency
Planning & Building
Council Approval Date
2/6/2006
Insurance Exp Date
9/30/2007
Destruction Year
2012
Notes
Amended by A-2007-057
Document Relationships
EIP ASSOCIATES dba (PBS&J) POST, BUCKLEY, SCHUH & JERNIGAN, INC. 6A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\E-F (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal to Prepare an EIR and Provide Planning Consulting Services for the <br />First and Fourth Street Corridors Mixed -Use Overlay Zone <br />Subtask 4b: Distribute Draft EIR <br />EIP will provide the City with fifty (50) copies of the Draft EIR after the City approves final drafts, <br />including the fifteen (15) copies (as required by the Governor's Office of Planning and Research/State <br />Clearinghouse) of the Draft EIR to be filed at the State Clearinghouse. It is assumed that the City (or <br />the Applicants) would be responsible for preparation of the Notice of Completion and any filing fees. <br />OUTPUT <br />1. Distribute fifty (50) bound copies of the Draft EIR for public review (this number includes the copies <br />of the Draft EIR that are submitted to the State Clearinghouse). Should the City determine that <br />additional copies of the Draft EIR are necessary; their production would be treated as an Optional <br />Task. <br />2. Provide one (1) clean reproducible original of the Draft EIR and one (1) electronic copy. <br />TASK 5: PREPARE ADMINISTRATIVE FINAL BRAND DRAFT MMP RESPONSE TO DRAFT <br />EIR COMMENTS) <br />This task will result in the preparation of a Preliminary Final EIR, which will contain a list of commenters, <br />comment letters, responses to comments on the Draft EIR, Draft EIR text revisions, the Draft EIR itself, <br />and the Draft Mitigation Monitoring Program (MMP). <br />Subtask 5a: Prepare Administrative Final EIR (Response to Comments) <br />The City's project planner will compile and transmit all written comments on the Draft EIR throughout <br />the public review period and as one unified set of comments following the close of the public review <br />period. EIP will confer with City staff to review written comments on the Draft EIR, including comments <br />from public meetings and hearings, to develop a general strategy for preparation of responses. The <br />Administrative Final EIR will be submitted to City staff for review and comment. <br />Subtask 5b: Prepare Draft MMP <br />The objective of this subtask is to ensure compliance with Public Resources Code Section 21081.6, as <br />mandated by Assembly Bill 3180 (Cortese 1988), which requires a lead agency to adopt a mitigation <br />monitoring program (MMP) at the time an EIR is certified. <br />EIP will prepare a Draft MMP concurrently with the preparation of the Administrative Final EIR, upon <br />finalization of project mitigation measures. The MMP will be designed to ensure compliance with all <br />adopted mitigation measures during project implementation. The MMP will be in table format, and will <br />specify mitigation measures, standards of success, conditions of approval, parties responsible for <br />implementation and monitoring, funding sources, timing and frequency, criteria to determine <br />compliance with conditions, and provisions for remedial measures (if the success standards are not <br />achieved). <br />The MMP will be designed to fit into the Citys existing entitlement and project review process <br />
The URL can be used to link to this page
Your browser does not support the video tag.