My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EIP ASSOCIATES 6
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
E-F (INACTIVE)
>
EIP ASSOCIATES 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 4:29:41 PM
Creation date
4/12/2006 1:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
EIP Associates dba Post, Buckley, Schuh & Jernigan, Inc. (PBS&J)
Contract #
A-2006-021
Agency
Planning & Building
Council Approval Date
2/6/2006
Insurance Exp Date
9/30/2007
Destruction Year
2012
Notes
Amended by A-2007-057
Document Relationships
EIP ASSOCIATES dba (PBS&J) POST, BUCKLEY, SCHUH & JERNIGAN, INC. 6A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\E-F (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal to Prepare an EIR and Provide Planning Consulting Services for the <br />First and Fourth Street Corridors Mixed -Use Overlay Zone <br />• Distribute eight (8) unbound copies of the Administrative Final EIR and Draft MMP for City staff <br />review. <br />• One (1) electronic copy of the Administrative Final EIR and Draft MMP. <br />• Distribute twenty-five (25) copies of the Final EIR and Final MMP. Production of the Final EIR is <br />not included in the attached cost proposal. <br />• Provide one (1) clean reproducible original of the Final EIR and Final MMP and one (1) <br />electronic copy. <br />Factors that would increase the scope of work and estimated costs outlined in the proposal include: <br />new issues to be evaluated in response to the Notice of Preparation; attendance at additional public <br />meetings; printing of additional copies of reports or the need to distribute a second ADEIR or <br />Screencheck version of the document; analysis of additional issues above those discussed in this <br />proposal or a more detailed level of analysis than described in this proposal; changes in the project <br />requiring reanalysis or rewriting of report sections; collection of data required for the EIR beyond that <br />described in this proposal; attendance at additional in-house meetings beyond those budgeted; and <br />excessive public comments on the DEIR, or comments on the ADEIR or AFEIR related to substantial <br />changes to the project description. EIP would notify the City immediately (and prior to proceeding with <br />out -of -scope work), if any of these conditions appears likely to occur. We would propose to renegotiate <br />these items, if required, or charge on a time -and -materials basis. The breakdown of our proposed cost <br />estimate is valid for 60 days from the date of this proposal. The estimated cost is based on all team <br />members' standard hourly rates, as reflected in the standard Billing Rate Schedule attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.