Laserfiche WebLink
Proposal to Prepare an EIR and Provide Planning Consulting Services for the <br />First and Fourth Street Corridors Mixed -Use Overlay Zone <br />• Distribute eight (8) unbound copies of the Administrative Final EIR and Draft MMP for City staff <br />review. <br />• One (1) electronic copy of the Administrative Final EIR and Draft MMP. <br />• Distribute twenty-five (25) copies of the Final EIR and Final MMP. Production of the Final EIR is <br />not included in the attached cost proposal. <br />• Provide one (1) clean reproducible original of the Final EIR and Final MMP and one (1) <br />electronic copy. <br />Factors that would increase the scope of work and estimated costs outlined in the proposal include: <br />new issues to be evaluated in response to the Notice of Preparation; attendance at additional public <br />meetings; printing of additional copies of reports or the need to distribute a second ADEIR or <br />Screencheck version of the document; analysis of additional issues above those discussed in this <br />proposal or a more detailed level of analysis than described in this proposal; changes in the project <br />requiring reanalysis or rewriting of report sections; collection of data required for the EIR beyond that <br />described in this proposal; attendance at additional in-house meetings beyond those budgeted; and <br />excessive public comments on the DEIR, or comments on the ADEIR or AFEIR related to substantial <br />changes to the project description. EIP would notify the City immediately (and prior to proceeding with <br />out -of -scope work), if any of these conditions appears likely to occur. We would propose to renegotiate <br />these items, if required, or charge on a time -and -materials basis. The breakdown of our proposed cost <br />estimate is valid for 60 days from the date of this proposal. The estimated cost is based on all team <br />members' standard hourly rates, as reflected in the standard Billing Rate Schedule attached. <br />