My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-04-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
04/17/2006
>
FULL PACKET_2006-04-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:47:15 PM
Creation date
4/12/2006 2:11:12 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 3180 <br />Elevated Tank Safety Improvements and Painting <br />April 17, 2006 <br />Page 2 <br />NAME OF BIDDER CITY BID AMOUNT <br />1. Utility Service Company, Inc. Perry, GA $1,098,850.00 <br />2. Metro Builders & Engineers Newport Beach, <br />Group, Ltd. CA $1,411,452.80 <br />A total of three bids were received and two were responsive. Robinson- <br />Prezioso, Inc. failed to notorize their signature on the bid bond as <br />required by the bidding documents and therefore, Robinson-Prezioso, <br />Inc.'s bid is non-responsive. The lowest bid was submitted by Utility <br />Service Company, Inc., for $1,098,850, which is above the Engineer's <br />estimate of $905,000. The high bid is due to the uniqueness of the <br />project. <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the <br />recommended action is exempt from further review. Categorical Exemption <br />ER No.00-166 has been filed. <br />FISCAL IMPACT <br />The funding analysis shows a total estimated construction cost of <br />$1,373,600 for the project (Exhibit 3) Funds are available in the Water <br />Enterprise Capital Projects Fund (account no. 66-579-6635). <br />/ APPROVED AS TO FUNDS AND ACCOUNTS: <br />/i / <br />l~'~vtl,`Gf <br />Ja s G. o s ~ancisco Gutierrez <br />Executive Director ~ Executive Director <br />Public Works Agency Finance & Mgmt. Services Agency <br />K:\Construction\RFCA-draft\3180 2006-04-17 260 WD <br />23B-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.