My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
32A - TTM 2005-11, 2000 E FIRST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
05/01/2006
>
32A - TTM 2005-11, 2000 E FIRST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:46:57 PM
Creation date
4/26/2006 11:54:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
32A
Date
5/1/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />forth general and specific requirements for all construction <br />sites in the South Coast Air Basin. The general requirement <br />prohibits a person from causing or allowing emissions of <br />fugitive dust from construction such that the presence of this <br />dust remains visible in the atmosphere beyond the property line <br />of the emissions source. To insure Fugitive Dust Rule 403 is <br />implemented, the following mitigation measure shall be <br />implemented. <br /> <br />Mitigation Measure <br /> <br />. Grading plans for the proposed project shall reflect the <br />following notes: <br /> <br />1. All material excavated or graded will be sufficiently <br />watered to prevent excessi ve amounts of dust. <br />Watering with complete coverage shall occur at least <br />twice daily, once in the late morning and once after <br />work is done for the day. <br /> <br />2. All clearing <br />during period <br />averaged over <br />smog episodes. <br /> <br />and earthwork activities shall cease <br />of high winds (winds greater than 25 mph <br />one hour) or during Stage 1 or Stage 2 <br /> <br />3. Streets surrounding the project site should be cleaned <br />at the end of each day of construction. <br /> <br />4. All material transported offsite shall <br />sufficiently watered or securely covered <br />excessive amounts of dust. <br /> <br />either be <br />to prevent <br /> <br />5. The amount of area disturbed by clearing and earthwork <br />activities shall be minimized at all times. <br /> <br />6. Equipment engines shall be <br />condition and in proper <br />manufacturer's specifications. <br /> <br />maintained in <br />tune according <br /> <br />good <br />to <br /> <br />E. Create objectionable odors affecting a substantial number <br />of people? <br /> <br />Less Than Significant Impact <br /> <br />The operation of the proposed project would not generate odors <br />that would be objectionable to the public. During construction <br />operations some objectionable odors could be emitted from <br /> <br />9 <br /> <br />3~A~3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.