My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
32A - TTM 2005-11, 2000 E FIRST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
05/01/2006
>
32A - TTM 2005-11, 2000 E FIRST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:46:57 PM
Creation date
4/26/2006 11:54:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
32A
Date
5/1/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />A-4. Landslides <br /> <br />No Impact <br /> <br />The project area is flat without any topographical relief. <br />According to General Plan Land Use Element EIR, there are no <br />landslide planes or slopes within the project area. Therefore, <br />implementation of the proposed project would not result in <br />adverse impacts in regards to landslides. <br /> <br />B. Would the project result in substantial soil erosion or the <br />loss of topsoil? <br /> <br />Potentially Significant Unless Mitigation Incorporated <br /> <br />Erosion refers to the removal of soil from exposed bedrock <br />surfaces by water or wind. The effects of erosion are <br />intensified with an increase in slope, the narrowing of runoff <br />channels and by the removal of groundcover, which leaves the <br />soil exposed. <br /> <br />construction operations for the proposed project would require <br />the grading of onsite soils. The uncovered soils on the project <br />site could potentially result in erosion and sedimentation <br />impacts to onsite and off site drainage facilities. This <br />potential impact could increase during periods of rain. To <br />reduce potential erosion impacts to a level considered less than <br />significant, the following mitigation measure shall be <br />implemented. <br /> <br />Mitigation Measure <br /> <br />. <br /> <br />Prior to the issuance of grading permits, the project <br />developer shall show proof of coverage under NPDES General <br />Industrial Activity Storm Water Permit, which includes a <br />copy of the project's permit issued by the State Water <br />Resource Control Board that identifies the permit number. <br /> <br />. <br /> <br />Prior to the issuance of a grading permit the applicant <br />shall submit for review and approval a surface <br />drainage/grading plan/erosion control plan, prepared by a <br />registered Civil Engineer, showing the direction and means <br />of flow to adjacent streets. The plan is to include <br />existing and proposed elevations at and adjacent to all <br />property lines. Drainage routed to the street must be <br />directed beneath the sidewalk and through the curb. <br /> <br />13 <br /> <br />3~~7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.