Laserfiche WebLink
<br />which might have an adverse physical effect on the <br />environment. <br /> <br />Less Than Significant Impact <br /> <br />Implementation of the proposed project would not generate <br />additional demands on existing recreation facilities or require <br />the construction of new recreation facilities. <br /> <br />xv. TRANSPORTATION/TRAFFIC <br /> <br />The following analysis is based on a traffic screening analysis <br />prepared for the proposed project by P&D consultants in May of <br />2005. The traffic report is presented in its entirety in <br />Appendix A. <br /> <br />A. Cause an increase in traffic, which is substantial in <br />relation to the existing traffic load and capacity of the <br />street system? <br /> <br />B. Exceed, either individually or cumulatively, a level of <br />service standard established by the county congestion <br />management agency for designated roads or highways? <br /> <br />Less than Significant <br /> <br />City of Santa Ana Roadway Segment/Intersection Analysis <br /> <br />The project site is located within the northeastern area of the <br />City of Santa Ana at the intersection of First Street and Golden <br />Circle. <br /> <br />The proposed project is consistent with the City's General Plan <br />Land Use Element. The proposed project would generate 816 daily <br />vehicle trips with 56 occurring during the AM peak hour and 84 <br />during the PM peak hour. The amount vehicle trips generated by <br />the proposed project would be consistent with the traffic <br />projections in the Circulation Element and would not reduce the <br />level of service of any roadway segments or intersections within <br />the project area. <br /> <br />Even though the proposed project would not result in significant <br />traffic impacts, it would contribute traffic to the regional <br />transportation network. To address regional traffic impacts the <br />proposed project would be subject to Foothill Ranch <br />Transportation Corridor Fee and Transportation System <br />Improvement Fee. <br /> <br />29 <br /> <br />34A~3 <br />