Laserfiche WebLink
The three proposed buildings are referred to as Building A, <br />Building B and Building C. <br />Building A consists of 8,171 square feet of area. The building <br />would contain a 8,171 square foot sit down restaurant with an <br />outdoor dinning area. In the future, this restaurant may <br />include a concert venue and/or nightclub within existing square <br />footages which would operate exclusively during the evening <br />hours when other uses within the office park are closed. A <br />nightclub/concert venue would require separate City approvals. <br />Building B would consist of 5,302 square feet of area. The <br />building would contain 4,315 square feet of food uses including <br />a 1,486 square foot coffee shop. In addition, 987 square feet of <br />retail uses are proposed. <br />Building C would consist of 6,681 square feet of area. The <br />building would contain 2,500 square feet of food uses and two <br />retail tenant spaces totaling 4,211 square feet. <br />As shown on Exhibit 3 the three buildings reflect a modern <br />architecture design. The exterior of the buildings would have a <br />smooth troweled plaster finish, natural concrete finish and a <br />light sand plaster finish. The exterior building finish would be <br />accented with stone veneer, cultured stone veneer, and aluminum <br />storefront systems. A combination of tans and metal paint <br />finishes would be incorporated into the design of the buildings. <br />Parking <br />A total of 174 parking spaces are required for the project while <br />175 parking spaces are provided on site. In the future, the <br />8,060 square foot restaurant may include a concert venue and/or <br />nightclub which would operate exclusively during the evening <br />hours when other uses within the office park are closed. Should <br />this occur at some future date, parking could be shared between <br />uses within the office park since they would operate at <br />different times. <br />Phasing/Construction Operations <br />The proposed project would be developed in one phase. <br />Construction operations for the project would involve the <br />clearing of the project site and construction of the three new <br />buildings. <br />3 <br />7 ~ei'k3~ <br />