My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2006-06-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2006
>
06/19/2006
>
FULL PACKET_2006-06-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:45:36 PM
Creation date
6/14/2006 3:12:53 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />JUNE 19, 2006 <br />TITLE: <br />CONTRACT AWARD FOR BROADWAY <br />REHABILITATION AND WATER MAIN <br />IMPROVEMENTS FROM FIRST <br />STREET TO CIVIC CENTER DRIVE <br />(PROJECT NOS. 05-1705 AND 06- <br />3199) <br />:~ <br />CITY MANAGER <br />RECOMMENDED ACTION <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />^ As Recommended <br />^ As Amended <br />^ Ordinance on 1St Reading <br />^ Ordinance on 2nd Reading <br />^ Implementing Resolution <br />^ Set Public Hearing For_ <br />CONTINUED TO <br />FILE NUMBER <br />1. Award a contract to All American Asphalt, the lowest responsible <br />bidder, in accordance with unit bid prices in the estimated amount of <br />$1,499,494 for construction of Broadway rehabilitation and water main <br />improvements from First Street to Civic Center Drive. <br />2. Approve a Funding Analysis with a total estimated construction cost <br />of $1,874,300. <br />DISCUSSION <br />Broadway between First Street and Civic Center Drive has been identified <br />as a high priority on the City's Pavement Management System (Exhibit 1). <br />The pavement is deteriorating due to weather, age and heavy usage. Some <br />of the adjacent curbs, gutters, sidewalks, and driveway approaches are <br />also in various state of disrepair. The existing water mains were built <br />in the 1950's. <br />This project provides for the construction of new street pavement and the <br />replacement of damaged concrete curbs, gutters, sidewalks, and driveway <br />approaches. Additionally, since the street is being repaved and the water <br />mains are near the end of their useful lifespan, they should also be <br />replaced. Once completed, these improvements will enhance the ride <br />quality, surface drainage and visual appearance of the street. <br />The Notice Inviting Bids was advertised on April 14 and 17, 2006, and <br />bids were opened on May 9, 2006. A summary of the bid invitations <br />mailed, the bids received, and the bid results follows. <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.