Laserfiche WebLink
TASK 11: INFORCE AB PRODUCTION CUTOVER <br />OBJECTIVE <br />Place InForce AB into Production Operation. <br />TASK DESCRIPTION <br />Once Functional and Integration testing are complete, Visiphor will certify the InForce AB system as <br />operational and ready for production operation and assist Santa Ana in placing the subsystem into <br />productive use. Visiphor personnel may be on site for pre-live cut and post-live cut support. Visiphor <br />personnel will fine-tune the InForce AB software application for optimal performance. After live cut, a 30- <br />day reliability test period will begin. <br />RESPONSIBILITIES <br />Visiphor Responsibilities <br />Assist Santa Ana staff in placing InForce AB into a production status. <br />Monitor the initial operation of InForce AB and answer any operational questions raised by Santa <br />Ana. <br />Assist the training staff in utilizing the system and the computer operations staff in supporting the <br />subsystem. <br />Santa Ana Responsibilities <br />Place the software into production within five (5) calendar days following certification and begin <br />operational use in consultation with Visiphor and in accordance with the Project Schedule. <br />COMPLETION CRITERIA <br />This task is considered complete when INFORCE AB is placed into production operation. <br />Page 36 of 41 <br />Version 1.0 <br />