<br />Exhibit A <br />Project Description/Statement of Work <br /> <br />This project is being proposed as part of a coordinated trunk sewer relief effort <br />undertaken by the City of Santa Ana and the Orange County Sanitation District (OCSD). <br />In September, 2003 the City completed a sewer master plan that identified wet weather <br />capacity deficiencies in the Bristol Street trunk sewer. Some reaches of this trunk <br />sewer are owned by the City, while others are owned by OCSD. In March, 2005, OCSD <br />performed a more detailed study of this facility which resulted in a Coordinated Trunk <br />Sewer Plan dated March 21, 2005. <br /> <br />The Coordinated Trunk Sewer Plan identified cost effective alternatives to upsizing the <br />Bristol Street trunk sewer. The selected alternative involves the construction of a relief <br />sewer in Civic Center Drive from Flower Street to Bristol Street and upsizing an existing <br />sewer in Myrtle Street from Bristol Street to Raitt Street. These two projects will provide <br />capacity relief to the Bristol Street trunk sewer by diverting flow to the OCSD Raitt <br />Street trunk sewer. <br /> <br />The City's sewer master plan estimated the cost at $3,290,000 to upgrade the City's <br />portion of the Bristol Street trunk sewer. The Coordinated Trunk Sewer Plan estimated <br />the cost at $2,850,000 to upgrade the OCSD portion of the Bristol Street trunk sewer. <br />The total cost to both agencies would have therefore been $6,140,000. <br /> <br />The estimated cost of the selected alternative identified in the Coordinated Trunk Sewer <br />Plan is $2,850,000. This will result in a savings of $3,290,000 for the City and OCSD <br />combined. <br /> <br />A letter dated August 17, 2005 from OCSD to the City of Santa Ana describes the how <br />the selected alternative will be implemented by each agency. The City will construct the <br />Civic Center Drive sewer and OCSD will construct the Myrtle Street sewer. <br /> <br />The project being submitted by the City for Cooperative Project consideration consists <br />of 2,625 linear feet of 15" and 18" sewer in Civic Center Drive from Flower Street to <br />Bristol Street. Due to coordination with a proposed street resurfacing project, a contract <br />for the Civic Center Drive sewer was awarded at the April 3, 2006 City Council meeting. <br /> <br />A-1 <br />