Laserfiche WebLink
<br />PROJECT GOALS AND OBJECTIVES: <br /> <br />Construction of this project will provide relief of the Bristol Street trunk sewer during wet <br />weather events. During periods of high rainfall, the existing Bristol Street trunk sewer <br />can surcharge, causing other tributary City sewers to surcharge as well. A surcharge <br />condition can cause sanitary sewer overflows (SSO's) from City sewer manholes. The <br />primary goal of this project is to provide relief capacity for the Bristol Street trunk sewer <br />by diverting flow to the OCSD Raitt Street trunk sewer, thereby preventing wet weather <br />SSO's. A secondary objective is to accomplish this goal in the most cost effective <br />manner. <br /> <br />SCOPE OF WORK <br /> <br />1. Prepare bid documents. <br /> <br />2. Advertise project for bid. <br /> <br />3. City Council bid award. <br /> <br />4. Construct the project by contractor. <br /> <br />PROJECT END PRODUCTS AND DELlVERABLES <br /> <br />The end product will be the completed Civic Center sewer, consisting of 2,625 linear <br />feet of 15" and 18" sewer main. Interim and final reports will be provided to OCSD. <br /> <br />PROJECT LOCATION <br /> <br />The project limits are Civic Center Drive from Flower Street to Bristol Street (location <br />map attached). <br /> <br />A-2 <br />