My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KALISKI, JOHN AIA DBA URBAN STUDIO 2C - 2006
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
KALISKI, JOHN AIA DBA URBAN STUDIO 2C - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2017 10:28:58 AM
Creation date
8/15/2006 2:06:01 PM
Metadata
Fields
Template:
Contracts
Company Name
Kaliski, John / Urban Studio
Contract #
A-2006-147
Agency
Planning & Building
Council Approval Date
6/19/2006
Expiration Date
12/31/2007
Insurance Exp Date
12/13/2006
Destruction Year
2016
Notes
Amends N-2003-155, A-2004-240, N-2003-155-02 Amended by A-2006-316, A-2008-002
Document Relationships
KALISKI, JOHN AIA DBA URBAN STUDIO 2D - 2006
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
KALISKI, JOHN AIA DBA URBAN STUDIO 2 - 2003
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
KALISKI, JOHN AIA DBA URBAN STUDIO 2A - 2004
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
KALISKI, JOHN AIA DBA URBAN STUDIO 2B - 2003
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
KALISKI, JOHN AIA DBA URBAN STUDIO 2E - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rate $105 1 $55 <br />Position I Principal I Designer 1 <br />Task 11 Site Visit, Review of Existing Materials, and Base Maps <br />Site Visit(1) 4 4 <br />Review Materials 4 8 <br />Base Maps (2) 1 32 <br />Photo Boards 1 8 <br />Task 2 Conceptual Design <br />Diagramatic District Streetscape Plan (1) 4 24 <br />Typical Street Sections (8) 4 24 <br />Typical Street Furniture Selections 4 16 <br />Revision of Boards (4) 4 24 <br />Report/Memorandum 4 2 <br />Preliminary Unit Cost Estimate 41 8 <br />Final Unit Cost Estimate 21 4 <br />Subtotal Labor (hours) <br />Subtotal Labor ($) <br />Fee Excluxive of Reimbursables <br />Reimbursables (%) <br />Reimbursable Estimate ($) <br />Fee Inclusive of Reimbursables <br />
The URL can be used to link to this page
Your browser does not support the video tag.