Laserfiche WebLink
UL listing is required for any AC operated power supplies. <br />Active devices shall include a minimum of 12 hours of battery backup power. <br />Any in- building coverage system shall be installed by a City approved, <br />manufacturer - trained and certified installer. <br />T .J..G....­A ­Aim is rlafinarl halnw' <br />3. Remedies to achieve compliance (Acceptable Amplification Systems); <br />If needed to ensure compliance with the 90% reliability factor, the property owner must <br />install each of the following: <br />An in- building coverage system composed of a radiating cable system or an <br />internal multiple antenna system with FCC - certified bi- directional 800 MHz <br />amplifier(s), distribution system, and subcomponents. <br />Any active devices (e.g. signal booster(s)) must be encased in a NEMA 4 (or <br />equivalent) dust/waterproof case and clearly labeled "City of Santa Ana Public <br />Safety Radio ". <br />Multi -band pass filters as required. <br />In the event of a power outage, all electrical components must be equipped with <br />independent auxiliary battery power or generators to function at full capacity for at least <br />twelve (12) hours. <br />Ordinance No NS -2722 <br />Page 7 of 9 <br />DAQ <br />Subjective Performance Description <br />Delivered <br />Audio <br />Qualit <br />1 <br />Unusable, speech resent but unreadable. <br />2 <br />Understandable with considerable effort. Frequent repetition due to <br />noise / distortion. <br />3 <br />Speech understandable with slight effort. Occasional repetition required <br />due to noise / distortion. <br />3.5 <br />Speech understandable with repetition only rarely required. Some noise <br />/ distortion. <br />4 <br />Speech easily understood. Occasional noise / distortion. <br />4.5 <br />Speech easily understood. Infrequent noise / distortion. <br />5 <br />Speech easily understood. <br />3. Remedies to achieve compliance (Acceptable Amplification Systems); <br />If needed to ensure compliance with the 90% reliability factor, the property owner must <br />install each of the following: <br />An in- building coverage system composed of a radiating cable system or an <br />internal multiple antenna system with FCC - certified bi- directional 800 MHz <br />amplifier(s), distribution system, and subcomponents. <br />Any active devices (e.g. signal booster(s)) must be encased in a NEMA 4 (or <br />equivalent) dust/waterproof case and clearly labeled "City of Santa Ana Public <br />Safety Radio ". <br />Multi -band pass filters as required. <br />In the event of a power outage, all electrical components must be equipped with <br />independent auxiliary battery power or generators to function at full capacity for at least <br />twelve (12) hours. <br />Ordinance No NS -2722 <br />Page 7 of 9 <br />