My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2722
Clerk
>
Ordinances
>
2000 - 2010 (NS-2416-2812)
>
2006 (NS-2707 - NS-2730)
>
NS-2722
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 2:58:20 PM
Creation date
8/23/2006 2:49:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2722
Date
8/21/2006
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Once a system is installed, a Spectrum Analyzer will be used to evaluate the system for <br />harmful interference to the 800 MHz Countywide Coordinated Communications System <br />backbone initially, and annually thereafter by an OCSD /Communications Division FCC - <br />certified technician. Any interference must be identified and removed before the system <br />can be accepted. <br />4. Applicable Federal Communications Commission Rule Compliance. <br />All active devices used to provide extended coverage must be FCC - certificated. <br />A. Test Standards. Design Review and Certification. <br />1. Prior to issuance of a building permit, the applicant shall: <br />i. Retain an FCC - certified technician who will review <br />construction plans in order to ensure that such plans meet <br />aforementioned radio communication criteria, and <br />recommend, if needed, an in- building solution for reliable <br />radio communication; <br />ii. Submit copies of plans certified with the signature of the <br />technician to the City of Santa Ana, SAPD /SAFD and <br />OCSD /Communications; <br />2. Prior to issuance of a Certificate of Occupancy, the applicant shall: <br />Retain an FCC - certified technician who will test all areas of <br />the building or structure, verify installation and operation of <br />in- building solutions, if needed, and certify all of the findings <br />stated herein on the date of inspection with his /her signature. <br />A passing test is one that demonstrates DAQ 3 with a 90% <br />reliability factor on each floor. Owners of buildings or <br />structures that fail to meet this standard will not be in <br />compliance with this ordinance. <br />ii. The building owner must retain all records of initial and <br />annual inspections and submit copies to the City of Santa <br />Ana, SAPD /SAFD, and OCSD /Communications. <br />B. Initial Test Procedure. For purposes of testing, each floor of the building <br />shall be divided into a grid of approximately twenty (20) equal areas. A <br />maximum of two (2) nonadjacent areas will be permitted to fail the test. In <br />the event that three (3) of the areas fail the test, and to provide greater <br />statistical accuracy, the floor may be divided into forty (40) equal areas. In <br />such an event, a maximum of four (4) nonadjacent areas will be permitted <br />to fail the test. As specified by the authority having jurisdiction, the test <br />shall be conducted by using a Motorola XTS 3000 /XTS 5000 or equivalent <br />portable radio talking through the 800 MHz Countywide Coordinated <br />Communications System. A spot located approximately in the center of a <br />Ordinance No NS -2722 <br />Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.