Laserfiche WebLink
Change Order No. 2 <br />Project No. 6372 <br />September 5, 2006 <br />Page 2 <br />Previously approved <br />Change Order: $38,300 10.0% <br />Total Change Orders: $46,412 19.0% <br />The contract documents require the installation of a block wall between <br />the residences and the new park. After the block wall was installed the <br />two residents whose houses backup to the block wall expressed concern <br />that the block wall was too low and was a privacy and potentially a <br />security issue. Therefore it is recommended to increase the height of the <br />block wall approximately 12 inches and modify the footing accordingly. <br />Agreed cost = $8,112 <br />After installing the irrigation system the Parks, Recreation and <br />Community Services Agency requested additional water pressure to <br />optimally operate the system. Therefore the addition of an irrigation <br />booster pump is recommended. <br />Agreed cost = $26,967 <br />The Council's approval is required to cover the extra costs exceeding the <br />project contingency. <br />FISCAL IMPACT <br />The cost for the change order is $35,079. The appropriation adjustment <br />will enhance the Residential Development Fees - District 2 revenue <br />account (account no. 312-01-5070-2) and expenditure account (account no. <br />312-232-6631) by $35,079. <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />1 <br />��GCr <br />Jam G. Ross F ancisco Gutierrez �I <br />Ex utive Director xecutive Director <br />P lic Works Agency Finance & Mgmt. Services Agency <br />K:\Construction\RFCA\6372 2006-08-21 CO2 <br />