My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DANIEL BOYLE ENGINEERING-2006
Clerk
>
Contracts / Agreements
>
D
>
DANIEL BOYLE ENGINEERING-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:02:56 PM
Creation date
9/8/2006 3:26:14 PM
Metadata
Fields
Template:
Contracts
Company Name
Daniel Boyle Engineerin g
Contract #
A-2006-178
Agency
Public Works
Council Approval Date
7/17/2006
Expiration Date
6/30/2007
Insurance Exp Date
10/15/2009
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
x> <br />., ~ -, <br />City of Santa Ana On-Call Engineering Design Services for <br />Water and Sewer Main Improvements <br />Rene Drive Neighborhood Water Main Improvements <br />Estimated Labor Hours <br /> <br /> .: <br />~~~ . <br />~ . <br />~ <br />TASK N0.1 -PRELIMINARY DESIGN <br />1.1 Pro'ect Kickoff and Initial Meetin 2 2 4 <br />1.2 ~DataGatherin 4 4 ~ 8 <br />1.3 Utility Research 4 4 8 <br />1.4 Potholing (Not required for this project) <br />1.5 Plans and S cifications (Included in Task 1-9) <br />1.6 Desi n 'Surve " (See Note 3) 4 I 4 8 <br />1.7 Prepare Base Maps 16 8 24 <br />_ 1.8 lAlignment5election 4 4 8 <br />1.9 Prepare Preliminary Plans 4 8 16 28 <br />1.10 Preliminary Plan Submittal 1 4 5 <br /> i Subtotal TaskNo.1 3 18 24 40 8 93 <br /> <br />TASK N0.2 -FINAL DESIGN <br />2.1 Construction Plans to 90%& 100% 2 8 16 8 8 42 <br />2.2 Su lemental Provisions 1 6 7 <br />23 Quanti and Cost Estimate 1 4 4 9 <br />2.4 90%and 100%Reviews 3 4 2 2 11 <br />2.5 Provide Deliverables 1 ~ 1 ,. 2 <br />2.6 <br />~ <br />~ Desi n Phase Meetin s 4 4 8 <br />2J <br />1 Prepare Record Drawings in CAD 1 2 4 7 <br />2.8 ~ Si nand Seal M ars 1 1 2 <br /> Subtotal Task No. 2 12 ~ 28 21 12 15 88 <br /> f <br />TASK N0.3 -BID PHASE SERVICES <br />3.1 Res nd to RFC's Burin biddin 1 4 5 <br />3.2 {Issue Addenda if necessa 1 4 4 4 13 <br />t Subtotal Task No. 3 2 8 4 ~ 4 0 18 <br />i i <br />TASK N0.4 -CONSTRUCTION SUPPORT <br />4.1 Attend Pre and Post Construction Meetin s 2 ~ 6 ` 8 <br />4.2 Res and to RFI's 2 4 4 I 10 <br />~ Subtotal Task No. 4 4 ~ 10 4 ~ 0 0 18 <br /> <br />i Total Estimated Hours and Fee 21 64 53 ~ 56 23 217 <br />In-House Staff <br />P.E.- Principal Engineer (Vernon Weisman) <br />'S.E. I -Senior Engineer (David Youngblood) <br />Ast Eng II -Assistant Engineer II (Khanh Nguyen) <br />Sr. Dsnr II -Senior Designer II (John Kaneshiro) <br />Dsnr-Designer (Bill Kuenne) <br />1. All above tasks are as stated in Exhibit "B" of the RFP <br />2. Traffic control plans not included, can be provided as additional <br />work per Exhibit "B', page 11 of RFP if requested by City. <br />3. Design "survey' for this project performed by design staff <br />4. No subconsultant services required for the scope of this project <br />5. Traffic control plans not included, can be provided as additional <br />work per Exhibit "B", page 11 of RFP if requested by City. <br />< t~ <br />l`~ J (u` <br />J <br />Scope of Services - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.