My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DANIEL BOYLE ENGINEERING-2006
Clerk
>
Contracts / Agreements
>
D
>
DANIEL BOYLE ENGINEERING-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:02:56 PM
Creation date
9/8/2006 3:26:14 PM
Metadata
Fields
Template:
Contracts
Company Name
Daniel Boyle Engineerin g
Contract #
A-2006-178
Agency
Public Works
Council Approval Date
7/17/2006
Expiration Date
6/30/2007
Insurance Exp Date
10/15/2009
Destruction Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Santa Ana <br />'~ On-Call Engineering Design Services for <br />Water and Sewer Main Improvements <br />-~ <br />Sample Plans <br />We are providing two samples of recent pipeline designs completed by members of our <br />proposed project team. These projects are representative of our pipeline design projects. <br />We have submitted them in digital "pdfl' format on compact disk (CD), one project per <br />CD, for your convenience. Instructions for reading them are printed on the CDs. <br />Sample 1 <br />Sample 1 is the Sewer Line Reconstruction Fiscal Year 2004/05 project for the City of <br />Laguna Beach. It consists of 26 small replacement projects that were consolidated into <br />one set of contract documents for bidding and award as one construction contract. The <br />bidding documents were distributed to prospective contractors on CD similar to the one <br />enclosed. Construction of this project has recently been completed. <br />Key Personnel: <br />Project Manager: Joe Boyle, PE <br />Project Engineer: Vernon Weisman, PE <br />Designer: Khanh Nguyen, EIT <br />Project Highlights: <br />6,500 LF of 6-Inch through 15-Inch Sewers <br />Gravity Sewer and Force Mains <br />Cured-in-Place Pipe (CIPP) Rehabilitation of Gravity Sewer and Force Mains <br />Dig and Replacement of Gravity Sewer and Force Mains <br />Construction in Pacific Coast Highway and Highway 133 (Caltrans Permitting) <br />Construction on Crescent Bay Beach <br />Sewer Replacements in Easements between Homes on Steep Hillsides <br />Sample 2 <br />Sample 2 is the 2004-2005 Water Main Replacement project for the City of Manhattan <br />Beach, California. This project is currently under design, the plans provided on the 2nd <br />CD are at 100% level of completion. This sample provides an excellent example of small <br />diameter water pipeline replacement plans prepared by our proposed design team. <br />Key Personnel: <br />Project Manager: Joe Boyle, PE <br />Technical Review: Vernon Weisman, PE <br />Project Engineer: Dave Youngblood, PE <br />Project Highlights: <br />4,000 LF of 6-Inch and 8-Inch DIP Replacement Water Mains <br />Construction in Narrow, Residential Streets in Beach Community <br />Daniel Boyle Engineering <br />Sample Plans - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.