Laserfiche WebLink
~,~ <br />,Y <br />City of Santa Ana On{ail Engineering Design Services for <br />Water and Sewer Main Improvements <br />TABLE 1 <br />City of Santa Ana <br />Rene Drive Neighborhood Water Main Improvements <br />Estimated Labor Hours and Fees <br /> .: <br />TASK N0.1-PRELIMINARY DESIGN <br />t.t 'Pro'edKickoffandlnitialMeetin 2 2 4 $542 $542 <br />1.2 :Data Gathering 4 4 , 8 $840 $250 $1,090 <br />1.3 ~UtilityResearch 4 4 8 $736 $736 <br />1.4 j Potholing (Not required for this project) <br />1.5 Plans and 5 ecifications (Included in Task 7-9) I <br />1.6 Desi n "Surve " (See Note 3) i 4 ~ 4 8 $736 $736 <br />1.7 Prepare Base Maps 16 8 24 $2,184 $2,184 <br />1.8 ~AlignmentSeledion 4 4 j 8 $840 $840 <br />1.9 Prepare Preliminary Plans 4 8 I 16 28 $2,740 $2,740 <br />1.10 ;Preliminary Plan Submittal t 4 ~ 5 $640 $640 <br />Subtotal Task No.1 3 18 I 24 ~ 40 8 ( 93 $9,258 ~ $250 $9,508 <br />i ~ ~ I <br />TASK N0.2 -FINAL DESIGN <br />2.1 iConstructionPlansto90%&100% 2 8 ~ 16 8 8 42 $4,080 $4,080 <br />2.2 !Su IementalProvisions 1 6 7 $886 $886 <br />2.3 Quantl and Cost Estimate 1 4 4 9 $988 5988 <br />2.4 ~90%and 100%Reviews 3 4 2 2 71 $1,288 51,288 <br />2S IProvideDeliverables 1 1 2 $166 $200 $366 <br />2.6 :;Desi nPhaseMeetin s 4 4 ~ 8 $1,084 $1,084 <br />2.7 ':Pre are Record Drawin sin CAD ~ 1 2 4 7 $633 $633 <br />2.8 ' Si nand Seal M lars 1 ~ 1 ~ ~ 2 $271 5271 <br />Subtotal Task No. 2 12 I 28 21 ~ 12 ~ 15 88 $9,396 ~ 5200 59,596 <br /> <br />TASK N0.3 -BID PHASE SERVICES ! f <br />3.1 :Res nd to RFC's Burin biddin 1 4 I 5 $640 $640 <br />3.2 'Issue Addenda ifnecessa 1 4 ~ 4 ' 4 13 $1,376 $100 $1,476 <br />Subtotal TaskNo.3 2 ~ 8 ! 4 ? 4 ~ ~ 0 I 18 52,016) 5100 $2,116 <br /> ~ I i <br />TASKN0.4-CONSTRUCTION SUPPORT ~ ~ I $0 <br />4.1 Attend Pre and Post Construction Meetin s 2 I 6 ~ 8 $1,034 $7,034 <br />4.2 !Res ondtoRFl's 2 t 4 4 10 $1,736 51,136 <br />Subtotal TaskNo.4 4 10 4 I 0 ~ 0 18 $2,170 SO $2,170 <br />~ ~ ' I <br />j Total Estimated Hours and Fee 21 ~ 64 ~ 53 ~ 56 f 23 I 217 $22,8401 $550 $23,390 <br />TOTAL NOT TO EXCEED FEE _ $23,390 <br />In-House Staff <br />P.E. -Principal Engineer Nemon Weisman) <br />S.E.1-Senior Engineer (David Youngblood) <br />Ast Eng II -Assistant Engineer II (Khanh Nguyen) <br />Sr. Dsnr II -Senior Designer II (John Kaneshiro) <br />All above tasks are as stated in Exhibit "B" of the RFP <br />12. Plan sheets are as shown in Scope of Services section of our proposal <br />3. Design "survey" for this project pertortned by design staff <br />4. No subconsultard services required for the scope of this project <br />5. Traffic control plaru not included, can be provided as additional <br />