Laserfiche WebLink
QUALIFICATIONS <br />During the last ten (10) years, members of our project team have been involved in the design and/or <br />construction of more than 75 miles of water, recycled water and sewer mains within fully developed <br />areas having extensive traffic control and utility conflicts. Focusing on similar projects, the following <br />is a brief list of several pipeline replacement projects that our project team has recently completed: <br />City of Torrance <br />20500 Madrona Avenue <br />Torrance, CA 90503-2684 <br />John Dettle, Project Manager <br />(310) 618-3059 <br />City of Tustin <br />300 Centennial Way <br />Tustin, CA 92780 <br />Tim Serlet, City Engineer <br />(714) 573-3150 <br />Moulton Niguel Water District <br />27500 La Paz Road <br />Laguna Niguel, CA 92677-3489 <br />Tom Stephenson, <br />Director of Engineering <br />(949) 425-3553 <br />Water Main Replacements — 2005/06 <br />Water Main Replacement — 2002/03 <br />Water Main Replacement — 182"d St. <br />Water Main Replacement — 2000 <br />Ponderosa Ave. Water Main <br />Replace. <br />Prospect Ave. Water Main Replace. <br />Water Main Replacement - 2002 <br />Water Main Replacement — 1996/97 <br />Water Main Replacement—1995/96 <br />Oso/Trabuco Creek Crossing <br />Cabot Road Pipelines <br />Pacific Park Recycled Water Main <br />Lower Mission Viejo RW Pipelines <br />Cedarbrook RW Pipelines <br />Pacific Park Water Mains <br />29,000 LF of 6" to 12" water mains <br />13,600 LF of 6" to 12" water mains <br />9,700 LF of 8" to 12" water mains <br />20,000 LF of 8" to 16" water mains <br />2,000 LF of 8" water mains <br />1,500 LF of 8" water mains <br />1,800 LF of 12" water mains ' <br />4,700 LF of 6" to 12" water mains <br />4,400 LF of 6" to 8" water mains <br />1,000 LF of 30" Sewer <br />10,000 LF of 12" to 24" pipelines <br />14,000 LF of 12" to 16" RW mains <br />11,000 LF of 12" to 16" RW mains <br />16,000 LF of 6" to 12" RW mains <br />16,000 LF of 36" to 42" water <br />mains <br />In addition, the Project Team was involved in over 30 different water, recycled water and sewer <br />pipeline relocations ranging in size from 8-inch to 48-inch diameter as part of the Eastern <br />Transportation Corridor for Silverado Contractors. We have also provided in the Appendix preprinted <br />color qualifications for some of our recent pipeline replacement projects. They include full <br />descriptions, construction costs and contact information. <br />SATISFIED CLIENTS <br />Client satisfaction is a major objective for Tetra Tech. This commitment to our clients has earned us <br />the privilege of providing continuous services to all of our above listed references. We believe that <br />our clients will attest to our technical experience and responsive staff. We encourage you to contact <br />our references to verify our past performance firsthand. <br />CITY OF SANTA ANA TETRA TECH, INC. <br />Orr -Call Engineering for Mater and Sewer Main Improvements 3 <br />